
Pool waterproofing before tiling in Makkah
Pool waterproofing before tiling in Makkah begins with photos of the concrete, joints and corners sent via WhatsApp. The district has villas with private gardens and residential buildings, some with pools needing concrete treatment before tiling.
Makkah has villas on large plots and modern residential blocks. Villa pools usually sit in private yards, while blocks may have shared pools. New concrete often shows minor cracks at joints and corners from rapid drying or heat expansion. Older concrete may need wider treatment. Intense heat and aridity speed cracking, so treating the base and joints before tiling stops problems from the start.
- Makkah is a district in the Eastern Province, near Al Fanatir, Najd and Al Hijaz, with modern villas and residential buildings.
- Pools in dry areas may crack faster than coastal ones due to moisture fluctuation.
What the service covers in Makkah
- Inspecting the concrete and locating cracks and hairline cracks
- Applying the waterproof layer across the floor, walls and pool rim
- Closing feed and drain pipe inlets and light fitting openings
- Cleaning the surface and removing casting residue and dust
The stages of the work in Makkah
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Pool waterproofing before tiling in MakkahWe choose the method and the materials once we know the condition of the spot.
Your request from Makkah comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing before tiling in Makkah
Why do cracks appear in a new pool in Makkah?
Intense heat and aridity cause concrete to expand and contract, especially with rapid filling or direct sun. Treating small cracks now stops seepage before they widen.
Do you treat Makkah pools right before tiling?
Yes, we serve Makkah. Send photos first to assess the concrete, cracks and joints. Treatment happens right before tiling so it doesn't face extra heat cycles.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
Do you cover Makkah?
Yes. We serve Makkah and nearby areas such as Al Fanatir, Najd and Al Hijaz, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Why is the pool shell waterproofed before tiling and not after?
Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
Areas near Makkah
Nearby areas we also cover: Al Fanatir, Najd and Al Hijaz.
More services in Makkah


