Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Al Hijaz

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Al Hijaz

Pool waterproofing after tiling in Al Hijaz begins with photos of the pool and leak traces, sent by call or WhatsApp. The district has villas and residential buildings of varying sizes, with pools in courtyards or gardens of different depths.

Al Hijaz has a mix of residential buildings with pools of varying shapes and levels. Leaks after tiling may come from expanded grout, concrete cracks, or erosion around embedded pipes and drains. Intense heat and inland dryness speed up grout cracking, and clear photos from multiple angles around the pool help us identify the leak source and the right repair material.

  • Al Hijaz is a district in the Eastern Province, close to Al Fanatir and Darin.
  • Pools in mixed residential districts may need careful detection to distinguish between grout leaks, deep cracks and damaged joints.
What the service includes

What we do for you in Al Hijaz

  • Resealing joints with a flexible water-resistant compound
  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Testing the leak area with dye and pressure-checking the lines
  • Injecting cracks with a compound suited to the concrete shell
How we work

The stages of the work in Al Hijaz

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Your request from Al Hijaz comes to usCall or WhatsApp on one number, and we answer you ourselves.

Pool waterproofing after tiling in Al HijazWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing after tiling in Al Hijaz

What is the difference between grout leaks and sub-tile cracks in Al Hijaz pools?

Grout leaks show on the tile surface and around edges directly, while sub-tile cracks cause dampness spread more widely around the pool. Photos show the pattern and location so we identify the problem and the right treatment.

Can an old tiled pool in Al Hijaz be repaired without full treatment?

Usually we focus on the specific leak source. If it is only grout, we seal the grout. If there are deep cracks or damaged joints, photos show us and we tell you what is needed to stop the leak effectively.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

What should I send you from Al Hijaz?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Hijaz, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Hijaz, in Makkah, Al Fanatir and Darin (near Al Fadili).

Other services in the area

More services in Al Hijaz

Pool at night with water jets after waterproofing

Pool waterproofing after tiling in Al Hijaz?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp