Abraj Al AzlContracting
Call العربية
Excavated villa foundation wall coated with black bitumen and a protection board

Foundation waterproofing in Al Khawr

Sealed before backfill

Waterproofing for foundations and below-ground walls with bitumen and membranes

+966 54 311 2066
The service in your area

Foundation waterproofing in Al Khawr

Foundation waterproofing in Al Khawr starts with photos of the base and below-ground walls sent by call or WhatsApp. The district has small residential and commercial buildings whose foundations face soil moisture and groundwater year-round.

Al Khawr is made up of medium-sized mixed residential and commercial buildings. Foundations here sit in damp soil, and below-ground walls may show leaks or seasonal or constant dampness. Treatment begins with cleaning the wall, filling cracks and voids, then applying waterproof membranes and sealants. Photos reveal the foundation's condition and existing dampness before the method is chosen.

  • Al Khawr is a district in the Eastern Province, close to Al Hamra, Sinaiyah Al Fawaziyah and Ibn Sina.
  • Foundations in dense urban areas face soil moisture and water pooling, especially after rare but heavy rain.
What the service includes

What we do for you in Al Khawr

  • Checking layer continuity at corners, edges and critical points
  • Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
  • Fixing protection boards over the waterproof layer before backfill
  • Checking the concrete walls and footing and locating cracks, joints and pipe openings
How we work

The steps of foundation waterproofing in Al Khawr

1

Send site photos

On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.

2

Prepare the surface

The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.

3

Apply the waterproof layer

Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.

4

Protection boards then backfill

Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.

What sets us apart

Why Abraj Al Azl?

The structure kept from moisture and saltsConstant moisture attacks the reinforcement and weakens the concrete over time, and the waterproof layer cuts that off from the start.

Foundation waterproofing in Al KhawrWe choose the method and the materials once we know the condition of the spot.

Al Khawr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about foundation waterproofing in Al Khawr

How can a foundation in Al Khawr be waterproofed without extra digging?

If the wall can be reached from outside, we clean it and apply the sealant to the surface. If it is enclosed, the photos show what options are possible and we will tell you.

Is dampness in a foundation in Al Khawr temporary or constant?

It depends on the building's location, soil and nearby water. Seasonal dampness appears after rain; constant dampness may come from natural flow or a nearby leak. Photos and questions clarify the cause.

How do I request foundation waterproofing in Al Khawr?

Call us, or send clear photos of the spot and its location in Al Khawr on WhatsApp, and we will work out the next step with you.

Is the waterproof layer affected by salty soil?

Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.

Why do cracks and joints need special treatment before waterproofing?

Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.

What materials are used in foundation waterproofing?

Common materials include torch-on or self-adhesive bitumen rolls, cold bitumen coating, and composite membranes, together with protection boards that shield the layer from soil pressure and backfill. The material choice depends on the wall, the soil conditions and the depth of the foundation.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Hamra (near Al Khobar), Sinaiyah Al Fawaziyah and Ibn Sina.

Other services in the area

More services in Al Khawr

Two workers on the roof insulating around an AC unit

Your first step in Al Khawr:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp