
PVC membrane waterproofing in Al Khawr
PVC membrane waterproofing of roofs and tanks in Al Khawr starts with a photo sent by call or WhatsApp. The district has mixed residential and commercial buildings, with exposed roofs subject to both sun and humidity, so membrane protection is essential.
Al Khawr has residential buildings of various ages and commercial structures, all with roofs exposed to weather year-round. Older roofs may carry traces of rare rain and heat damage, while newer ones may need lining renewal or extra protection. PVC membrane provides a sealed cover across the whole roof and at joints and penetrations, withstanding both heat and moisture. Photos show the roof's condition and areas needing special care before the membrane is laid.
- Al Khawr is a district in the Eastern Province, close to Al Hamra and Sinaiyah Al Fawaziyah, with multiple residential and commercial buildings.
- PVC membrane laid on a roof requires sealed joints at seams and wherever pipes or vents penetrate it.
The scope of the work in Al Khawr
- Welding seams with hot air and checking them after cooling
- Laying PVC sheets and fixing them by the method that suits the site
- Inspecting the concrete slab and assessing the old membrane
- Cleaning the surface and treating cracks and joints before laying
This is how we work in Al Khawr
Send photos of the roof or tank
On WhatsApp: photos of the full roof, the parapet, AC bases, pipe openings and drains, so we can assess the surface and decide the right fixing method and treatment.
Prepare the surface
The concrete slab is cleaned and cracks and joints are treated; old insulation is removed where its condition does not allow installation over it, and the surface is left to dry before any further step.
Lay the sheets and weld the seams
PVC sheets are laid across the surface and fixed by the method that suits the position; seams between sheets are welded with hot air, and the layer is turned up at the parapet and around penetrations.
Check the seams and add the protection layer
Welded seams are checked for continuity, then a protection layer or ballast is added over the membrane on exposed roofs so the PVC is kept from direct sun and foot traffic.
Why Abraj Al Azl?
The seam disappears in the weldHeat welding fuses the two sheet edges into one layer, so no exposed edge remains for water to get through.
Start from Al Khawr with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Al Khawr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Common questions on PVC membrane waterproofing in Al Khawr
Do PVC membranes suit older roofs in Al Khawr?
Yes, if the roof base is level and sound. Any damaged or uneven areas are repaired before the membrane is laid. Photos will show whether the roof is ready or needs additional preparation.
How are pipe joints and other penetrations sealed under PVC membrane in Al Khawr?
The membrane is laid to cover all penetrations, and edges are sealed with adhesive to prevent water seeping through. Photos and measurements determine the number of penetrations and the appropriate sealing method for each.
How do I request PVC membrane waterproofing in Al Khawr?
Call us, or send clear photos of the spot and its location in Al Khawr on WhatsApp, and we will work out the next step with you.
What is the difference between PVC sheets and bitumen rolls for roof waterproofing?
Bitumen rolls are usually torch-applied and are stiffer, while PVC sheets are lighter, more flexible and their seams are welded with hot air rather than a flame. Each suits different situations; send photos of the roof so we can advise which fits.
What decides the cost of a PVC roof waterproofing job?
The roof area, the condition of the concrete slab, the number of penetrations and AC bases, whether the old membrane must be removed, the fixing method that suits the site and how easily it can be reached. Send photos and rough dimensions on WhatsApp and we will advise on the treatment.
How are PVC sheet seams welded and can they be checked?
Seams are welded with a hot-air welder that melts the surface of both sheets and presses them together so they fuse. Once cooled, the seams are checked by hand and with specialist tools to confirm no unjoined spot remains. This check is part of the work and happens before the protection layer goes on.
PVC membrane waterproofing near Al Khawr
We also offer PVC membrane waterproofing in Al Hamra (near Al Khobar), Sinaiyah Al Fawaziyah and Ibn Sina, among the closest areas to Al Khawr.
More services in Al Khawr



