
Foundation waterproofing in Ibn Sina
Foundation waterproofing in Ibn Sina starts with photos sent via WhatsApp or a call. The district mixes industrial and residential areas with multi-storey buildings and workshops, where foundations are exposed to moisture from soil and groundwater. We choose between bitumen and membranes based on the depth and water pressure.
Ibn Sina has diverse buildings: workshops, warehouses and homes with varying foundations by age and soil. Older foundations often show dampness and cracks, while newer ones may need preventive waterproofing from the start. Soil moisture penetrates concrete slowly, especially where the water table is high. Photos reveal the surface condition, cracks and damp extent, so we decide whether to use liquid bitumen, flexible membranes or both.
- Ibn Sina is a district in the Eastern Province, close to the industrial areas of Al Fawaziyah, Ath Thuqbah and Al Iskan, mixing industrial and residential uses.
- Foundations in multi-storey buildings need strong waterproofing because the building's weight increases water pressure on them.
The main items of foundation waterproofing in Ibn Sina
- Treating cracks, pipe openings and joints before waterproofing
- Checking layer continuity at corners, edges and critical points
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
- Cleaning the surface and removing loose material and oil
How we carry out foundation waterproofing in Ibn Sina
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
Ibn Sina is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Foundation waterproofing in Ibn SinaWe choose the method and the materials once we know the condition of the spot.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book foundation waterproofing in Ibn Sina
Can an old building's foundation in Ibn Sina be sealed from the outside only?
If the outer wall is in good condition and accessible, we can treat dampness from outside with membranes and bitumen. But photos will tell us whether there is seepage inside or deep cracks needing repair before waterproofing.
Do workshops and warehouses in Ibn Sina need the same foundation waterproofing method as homes?
The waterproofing method depends on the foundation depth and water pressure around it, not the building type. But workshops may have extra drains or heavier loads, so we ask about that and photos help us pick the right approach.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
What do the protection boards do over the waterproof layer?
Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.
What should I send you from Ibn Sina?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ibn Sina, and we will work out the next step with you.
What decides the cost of foundation waterproofing?
The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.
The same service in nearby areas
Nearby areas we also cover: Sinaiyah Al Fawaziyah, Sinaiyah Ath Thuqbah and Al Iskan (near Al Khobar).
More services in Ibn Sina



