Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Umm al Hamam

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Umm al Hamam

We waterproof bathrooms with bitumen in Umm al Hamam starting from photos sent by call or WhatsApp. The village lies close to Umm Rubayah, UmmTali and Urayirah, with scattered rural houses.

The village has widely spaced rural houses, and their bathrooms are often built with exposed concrete floors before tiling. Such floors take water from basins and showers, so damage shows at the joints and corners around the drain. The photos reveal the floor's condition before any bitumen method is chosen.

  • Umm al Hamam is a village in the Al-Ahsa governorate of the Eastern Province, near Umm Rubayah and UmmTali.
  • Exposed concrete floors take repeated water from showers and basins, so their joints need attention.
What the service includes

What we do for you in Umm al Hamam

  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The steps of bitumen bathroom waterproofing in Umm al Hamam

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Umm al Hamam is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bitumen bathroom waterproofing in Umm al HamamWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Umm al Hamam

Does bitumen suit exposed concrete floors in the village?

It may suit them if the surface is clean, dry and level, but the photos decide that. If the floor is cracked, we will explain what repair is needed first.

What do you check in a rural bathroom before waterproofing?

We check the joints, corners, the drain and where the floor meets the wall. Send photos of these spots along with a general view of the bathroom.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you offer bitumen bathroom waterproofing in Umm al Hamam?

Yes. Umm al Hamam is within our service area in the Eastern Province, and we also work in Umm Rubayah, UmmTali and Urayirah. Call us or send photos of the spot on WhatsApp.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Umm al Hamam, the same service is available in Umm Rubayah, UmmTali and Urayirah.

Other services in the area

More services in Umm al Hamam

Pool at night with water jets after waterproofing

Tell us about your site in Umm al Hamam
and we will plan the next step with you

Describe the problem and where it is in Umm al Hamam, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp