Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in UmmTali

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in UmmTali

Bitumen bathroom waterproofing in UmmTali protects bathroom floors and wall bases under tiled finishes. Call us or send photos by WhatsApp, and we will look at the floor and walls with you before saying whether bitumen suits them.

UmmTali is a village of farm houses and walled plots, with family homes and a few villas among them. Bathrooms may stand apart from the main house and are sometimes reached across an open yard. Such structures are often built in stages, so floors and walls of different ages can meet in the same corner. Bitumen can bridge that junction in one continuous coat, but the photos must show the join clearly before any method is agreed.

  • UmmTali is a village in the Eastern Province, with Urayirah, Umm al Hamam and Umm Rubayah listed as its closest places.
  • Bathrooms built as a separate block often have a floor of a different age from the main house.
What the service includes

The main items of bitumen bathroom waterproofing in UmmTali

  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
How we work

From first contact to the finished job in UmmTali

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from UmmTali with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve UmmTali and around itIncluding Urayirah, Umm al Hamam and Umm Rubayah, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in UmmTali

Can a bathroom built apart from the house be treated?

Yes, separate bathroom blocks are common in farm homes here. Send photos of the floor, the wall bases and the entry point, and tell us how water reaches the room so we can judge the work from the pictures.

What do you need from us to begin in UmmTali?

Start with a call or a WhatsApp message with photos of the bathroom, including the floor, the wall junction and any visible cracks. Say whether the room is inside the main house or stands apart, and we will reply with the next steps.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you cover UmmTali?

Yes. We serve UmmTali and nearby areas such as Urayirah, Umm al Hamam and Umm Rubayah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near UmmTali

We also work near UmmTali, in Urayirah, Umm al Hamam and Umm Rubayah.

Other services in the area

More services in UmmTali

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in UmmTali?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp