Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Umm Rubayah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Umm Rubayah

In Umm Rubayah we apply bitumen waterproofing to bathroom floors and wall bases before screeding and tiling, starting from photos received by call or WhatsApp. The photos decide the method before anything else.

Umm Rubayah is a village of older and newer homes, and its bathrooms were built in varying ways. Damp usually shows first at the joints between floor and walls and around drain openings. We address those points first, and the photos show whether a bathroom needs full waterproofing or a limited repair.

  • Umm Rubayah is a village in the Eastern Province, close to Umm al Hamam, UmmTali and Urayirah.
  • Drain openings and pipes through the floor are points that need careful handling.
What the service includes

What the service covers in Umm Rubayah

  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
How we work

The steps of bitumen bathroom waterproofing in Umm Rubayah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Umm Rubayah and around itIncluding Umm al Hamam, UmmTali and Urayirah, as part of our work across the Eastern Province.

Bitumen bathroom waterproofing in Umm RubayahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Umm Rubayah

Can an old bathroom floor in Umm Rubayah be waterproofed?

Yes in most cases, provided the concrete is solid and undamaged. We repair cracks first, and if the base is failing the photos will show it before any work begins.

What should I send about my bathroom in Umm Rubayah?

Photos of the floor, the wall bases and the drain, any damp patches or cracks, and the age of the bathroom if you know it. That lets us identify what is needed without delay.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Is Umm Rubayah within your service area?

Yes, Umm Rubayah is one of the areas we work in, as are Umm al Hamam, UmmTali and Urayirah. To start, call us or message us on WhatsApp.

Nearby areas

Areas near Umm Rubayah

Nearby areas we also cover: Umm al Hamam, UmmTali and Urayirah.

Other services in the area

More services in Umm Rubayah

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Umm Rubayah?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp