Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Umm al Hamam

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Umm al Hamam

We provide bathroom waterproofing before tiling in Umm al Hamam, with a continuous membrane on the floor and wet walls ahead of adhesive and tiles. Send photos of the bathroom so we can settle what it needs with you.

Umm al Hamam is a village of houses, small farms and family homes, with many bathrooms renewed in stages. In a farm or country house the floor is sometimes less level, and damp gathers at the drain and at pipe openings in the wall. Work therefore begins by fixing and repairing what is there before the membrane goes on, and the photos show the state of each bathroom before any decision.

  • Umm al Hamam is a village in the Eastern Province, near Umm Rubayah, UmmTali and Urayirah, with houses and small farms.
  • Uneven floors need preparing before the membrane so water does not pool in hollows.
What the service includes

The bathroom waterproofing before tiling work in Umm al Hamam

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

How we carry out bathroom waterproofing before tiling in Umm al Hamam

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Umm al Hamam is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Umm al Hamam with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Umm al Hamam

Does waterproofing suit country-house bathrooms in Umm al Hamam?

Yes, bearing in mind floors may be less level. We correct the fall or level spots where needed, and confirm this from the photos.

Can a farm bathroom be waterproofed without full demolition?

Often yes, when the structure is sound and the damage is in the floor and joints. Specific spots are treated and the membrane is laid without demolition; the photos settle it.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Is Umm al Hamam within your service area?

Yes, Umm al Hamam is one of the areas we work in, as are Umm Rubayah, UmmTali and Urayirah. To start, call us or message us on WhatsApp.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Nearby areas

Bathroom waterproofing before tiling near Umm al Hamam

Nearby areas we also cover: Umm Rubayah, UmmTali and Urayirah.

Other services in the area

More services in Umm al Hamam

Worker applying the white insulation layer on a villa roof by the sea

In Umm al Hamam and need bathroom waterproofing before tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp