Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Az Zomorod Two

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Az Zomorod Two

Bitumen bathroom waterproofing in Az Zomorod Two starts with WhatsApp photos of the floor, walls and any leak location. The district has flats and villas in modern housing areas, and their bathrooms need strong waterproofing before tiling to handle daily moisture.

Az Zomorod Two is a relatively modern residential district with closely spaced villas and flats, whose bathrooms are often small and enclosed by concrete walls. Leaks down into the flat below or into the yard behind the wall occur when the waterproofing is not carefully applied around pipes, the floor and corners. Bitumen forms a solid layer before plumbing and tiling, but must be applied to a clean, dry surface. Photos show the moisture present and help us choose the right thickness.

  • Az Zomorod Two is a district in the Eastern Province near Al Masudiyah and Ad Dababiyyah, with villas and flats in a residential community.
  • A bathroom in a villa or flat is exposed to constant steam and water, so the waterproofing must reach under the floor and behind the walls from the base.
What the service includes

The bitumen bathroom waterproofing work in Az Zomorod Two

  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The stages of the work in Az Zomorod Two

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Bitumen bathroom waterproofing in Az Zomorod TwoWe choose the method and the materials once we know the condition of the spot.

Start from Az Zomorod Two with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Az Zomorod Two

When should a new bathroom in Az Zomorod Two be bitumen-waterproofed?

Just before tiling, once digging, plumbing and concrete are done. The floor and walls must be completely clean and dry before the bitumen is applied, as moisture weakens adhesion.

Do you treat leaks from an existing bathroom in Az Zomorod Two?

Yes, send us photos of the damp patches and the floor and walls inside and outside. We locate the leak from the photos, then remove damaged tiles and re-waterproof the area with bitumen before finishing again.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What should I send you from Az Zomorod Two?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Az Zomorod Two, and we will work out the next step with you.

Nearby areas

Bitumen bathroom waterproofing near Az Zomorod Two

If the site is outside Az Zomorod Two, the same service is available in Al Masudiyah, Umm Al Jazm and Ad Dababiyyah.

Other services in the area

More services in Az Zomorod Two

Pool at night with water jets after waterproofing

Tell us about your site in Az Zomorod Two
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp