Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Umm Al Jazm

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Umm Al Jazm

Bitumen bathroom waterproofing in Umm Al Jazm starts with photos of the floor and lower walls sent by WhatsApp or call. The district has scattered homes and villas, some old and some newer, with bathrooms needing waterproofing before tiling or repair from past seepage.

Umm Al Jazm has homes and villas of varied ages and sizes spread across wide areas. An old home may have a small bathroom showing damp or seepage from age. A newer villa may need preventive waterproofing in a new bathroom before use. Bitumen is applied to clean, dry surfaces, with application varying by surface condition and existing problems. Photos show the actual state.

  • Umm Al Jazm is a district in the Eastern Province, close to Ad Doij, Ad Dababiyyah and At Tawbi, with scattered homes and villas.
  • An old isolated home in a rural area may have a bathroom that was never waterproofed, making seepage and damp common problems needing treatment.
What the service includes

The scope of the work in Umm Al Jazm

  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The stages of the work in Umm Al Jazm

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Umm Al Jazm is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Umm Al Jazm and around itIncluding Ad Doij, Ad Dababiyyah and At Tawbi (near Ad Doij), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Umm Al Jazm

Can an old isolated home's bathroom be repaired with bitumen?

Yes, if the concrete base is sound, bitumen can be applied. Cracks and damp are treated first, then bitumen is applied. Send photos so we can assess the bathroom before determining the approach.

Is bitumen waterproofing suitable for a new bathroom in a villa in Umm Al Jazm?

Yes, bitumen is an effective preventive waterproofing for a new bathroom. The layer is applied to a well-prepared surface before tiling. Send photos of the new bathroom and the area to be waterproofed.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Do you cover Umm Al Jazm?

Yes. We serve Umm Al Jazm and nearby areas such as Ad Doij, Ad Dababiyyah and At Tawbi (near Ad Doij), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Bitumen bathroom waterproofing near Umm Al Jazm

Nearby areas we also cover: Ad Doij, Ad Dababiyyah and At Tawbi (near Ad Doij).

Other services in the area

More services in Umm Al Jazm

Pool at night with water jets after waterproofing

We start with you in Umm Al Jazm
with one call

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp