Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in At Tawbi (near Ad Doij)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in At Tawbi (near Ad Doij)

Bitumen bathroom waterproofing in At Tawbi begins with photos of the bathroom floor and wall bases, sent by call or WhatsApp. A bitumen layer is applied before the screed and tiling to cover the floor and corners and protect the layers below from moisture.

At Tawbi has a number of houses and villas spread across its neighbourhoods, and its bathrooms range from newly built to in need of renovation. Older houses may lack a clear membrane under the screed, so treatment before new tiling becomes an important step. The bathroom's layout and the number of pipes entering it affect the scale of work required. The photos show whether the bathroom needs full waterproofing or partial repair.

  • At Tawbi is a district in Dammam in the Eastern Province, close to Ad Doij, Umm Al Jazm and Al Madaris.
  • The more pipes that enter a bathroom, the more junctions need careful attention during waterproofing.
What the service includes

The bitumen bathroom waterproofing work in At Tawbi (near Ad Doij)

  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in At Tawbi (near Ad Doij)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve At Tawbi (near Ad Doij) and around itIncluding Ad Doij, Umm Al Jazm and Al Madaris, as part of our work across the Eastern Province.

Start from At Tawbi (near Ad Doij) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in At Tawbi (near Ad Doij)

Can a bathroom in At Tawbi be waterproofed before new tiles go in?

Yes, this is the right moment for bitumen, since the layer goes down before screed and tiling. Send photos of the current floor so we can see whether anything must be removed first.

Is partial treatment enough for an old bathroom in At Tawbi?

It may suffice if the damage is confined to certain spots, but if it extends across the floor, wider work is needed. The photos show the extent of the problem before any recommendation.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is At Tawbi (near Ad Doij) within your service area?

Yes, At Tawbi (near Ad Doij) is one of the areas we work in, as are Ad Doij, Umm Al Jazm and Al Madaris. To start, call us or message us on WhatsApp.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

The same service in nearby areas

We also work near At Tawbi (near Ad Doij), in Ad Doij, Umm Al Jazm and Al Madaris.

Other services in the area

More services in At Tawbi (near Ad Doij)

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in At Tawbi (near Ad Doij)?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp