Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Masudiyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Masudiyah

We waterproof bathrooms with bitumen in Al Masudiyah, Al Ahsa, starting from photos of the bathroom floor and wall bases sent by call or WhatsApp. The bitumen is placed before the screed and tiles to protect the floor from water seeping into the concrete.

Al Masudiyah is a residential district dominated by standalone houses and small units, with homes whose bathrooms are reworked once they have settled. In these houses damp usually appears at the corners and the wall bases where floor meets wall. The photos show whether the floor is exposed or whether an older layer must come off before lining.

  • Al Masudiyah is a residential district in Al Ahsa in the Eastern Province, close to Ash Shweikah, Az Zomorod Two and Ad Dababiyyah.
  • Where wall meets floor in a bathroom is a weak line, so that joint is sealed carefully before any other layer goes on.
What the service includes

The bitumen bathroom waterproofing work in Al Masudiyah

  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
How we work

This is how we work in Al Masudiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Al Masudiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Masudiyah and around itIncluding Ash Shweikah, Az Zomorod Two and Ad Dababiyyah, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Masudiyah

Does waterproofing a bathroom in Al Masudiyah require removing the tiles?

Not always. If the tiles are firmly bonded, the work may be limited to the affected areas; if they have come loose or cracked, the photos will show what needs to come up.

What sets bathroom waterproofing apart in Al Masudiyah?

Homes here are mostly standalone, so access to the bathroom is direct and the work centres on the floor and wall edges. Send us photos so we can settle on the right method for your home.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Do you offer bitumen bathroom waterproofing in Al Masudiyah?

Yes. Al Masudiyah is within our service area in the Eastern Province, and we also work in Ash Shweikah, Az Zomorod Two and Ad Dababiyyah. Call us or send photos of the spot on WhatsApp.

Nearby areas

Areas near Al Masudiyah

We also work near Al Masudiyah, in Ash Shweikah, Az Zomorod Two and Ad Dababiyyah.

Other services in the area

More services in Al Masudiyah

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Masudiyah?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp