Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ash Shweikah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ash Shweikah

Bitumen waterproofing for bathrooms in Ash Shweikah starts with photos of the base and floor sent via WhatsApp or phone. The district has houses and villas, and bathrooms need a waterproof layer before tiling and screed to prevent water leaks.

Bathrooms in this district face challenges from heavy use and daily moisture. Concrete floors may be old or need renewal and may contain cracks around pipe entries and corners. Bitumen forms a firm barrier preventing water from reaching walls and layers below. Photos show surface condition and help determine if prior treatment is needed.

  • Ash Shweikah is a district in the Eastern Province, near Al Masudiyah and Kuwaikib, with medium-sized houses and villas.
  • A bathroom without bitumen waterproofing allows damp to reach the foundation and adjoining walls.
What the service includes

What the service covers in Ash Shweikah

  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
How we work

From first contact to the finished job in Ash Shweikah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Bitumen bathroom waterproofing in Ash ShweikahWe choose the method and the materials once we know the condition of the spot.

Start from Ash Shweikah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ash Shweikah

Can an existing bathroom be waterproofed or must a new one be built?

An existing bathroom can be waterproofed if the old tiles and screed are removed. Photos show whether the base concrete is sound enough for waterproofing.

How long does bitumen take to dry after application in Ash Shweikah?

Drying time depends on weather and ventilation. After application, we tell you how long to wait before screed and tiling can go on.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What should I send you from Ash Shweikah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ash Shweikah, and we will work out the next step with you.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

The same service in nearby areas

If the site is outside Ash Shweikah, the same service is available in Al Masudiyah, Kuwaikib and Al Wadiah.

Other services in the area

More services in Ash Shweikah

Pool at night with water jets after waterproofing

Your first step in Ash Shweikah:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp