Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Az Zomorod Two

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Az Zomorod Two

Bathroom waterproofing before tiling in Az Zomorod Two begins with photos of the wet floor and walls sent by call or WhatsApp. Az Zomorod Two is a residential district with multiple homes, and each bathroom needs a tight waterproof layer before tiles are adhered.

Az Zomorod Two features diverse homes and residential buildings, whose bathrooms vary by age, condition and design. An older home may need extensive concrete and crack treatment before waterproofing, while a newer one may only require a fresh membrane to be applied. Seasonal humidity and heat affect surface integrity and tile joints, and photos clarify the level of need and treatment required before tiling begins.

  • Az Zomorod Two is a district in the Eastern Province near Al Masudiyah, Umm Al Jazm and Ad Dababiyyah, with varied residential homes.
  • A bathroom without waterproofing beneath the tiles allows water to penetrate the layers below even if the tiles appear sound on the surface.
What the service includes

The scope of the work in Az Zomorod Two

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
How we work

The steps of bathroom waterproofing before tiling in Az Zomorod Two

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Az Zomorod Two is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bathroom waterproofing before tiling in Az Zomorod TwoWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Az Zomorod Two

What is the difference between waterproofing a new bathroom and an old one in Az Zomorod Two?

A new bathroom requires the waterproof membrane to be applied directly to a prepared, sound concrete surface. An old bathroom may need the tiles removed first, then cracks and damaged concrete treated before waterproofing. Photos clarify the surface condition and required steps.

If a bathroom in Az Zomorod Two is leaking water from under the tiles, will new waterproofing stop the leak?

If the leak is due to a missing waterproof membrane, yes, a new one will stop it. But if it comes from deep concrete cracks or a pipe problem, those must be fixed first. Photos and the initial call determine the cause and solution.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Do you cover Az Zomorod Two?

Yes. We serve Az Zomorod Two and nearby areas such as Al Masudiyah, Umm Al Jazm and Ad Dababiyyah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Az Zomorod Two

If the site is outside Az Zomorod Two, the same service is available in Al Masudiyah, Umm Al Jazm and Ad Dababiyyah.

Other services in the area

More services in Az Zomorod Two

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Az Zomorod Two?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp