Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Yarmuk (near Hafar Al-Batin)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Yarmuk (near Hafar Al-Batin)

Bathroom waterproofing before tiling in Al Yarmuk means a continuous layer over the floor and damp-prone walls before adhesive and tiles go on. Send two or three photos of the bathroom by call or WhatsApp, and the condition will be clear before any material is chosen.

Al Yarmuk is a residential district of apartments and villas, and many bathrooms there sit inside multi-storey buildings where walls and pipes are shared. When a rented or refitted bathroom is retiled, the membrane usually goes over an older concrete floor, and corners and the drain area matter most. The photos show whether adjoining walls need treatment that reaches into the bathroom.

  • Al Yarmuk is a residential district in the Eastern Province, lying near Ghirnatah, Qurtubah and Al Jamiah.
  • Interior corners of a bathroom need more care than flat surfaces, because water gathers in them.
What the service includes

The scope of the work in Al Yarmuk (near Hafar Al-Batin)

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Forming and treating the floor-to-wall corners before the main layer
How we work

This is how we work in Al Yarmuk (near Hafar Al-Batin)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Bathroom waterproofing before tiling in Al Yarmuk (near Hafar Al-Batin)We choose the method and the materials once we know the condition of the spot.

We serve Al Yarmuk (near Hafar Al-Batin) and around itIncluding Ghirnatah (near Hafar Al-Batin), Qurtubah (near Hafar Al-Batin) and Al Jamiah (near Qaisumah), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Yarmuk (near Hafar Al-Batin)

Is waterproofing only the floor enough for an Al Yarmuk apartment bathroom?

Often not, since water also reaches the walls beside the shower and sink. The photos will show which wet areas need protection alongside the floor.

Do you treat damp coming from neighbouring units in Al Yarmuk?

We treat cases that show inside your bathroom, so send photos of the affected wall. If the source lies outside the bathroom, we will tell you and say what can be done.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Is Al Yarmuk (near Hafar Al-Batin) within your service area?

Yes, Al Yarmuk (near Hafar Al-Batin) is one of the areas we work in, as are Ghirnatah (near Hafar Al-Batin), Qurtubah (near Hafar Al-Batin) and Al Jamiah (near Qaisumah). To start, call us or message us on WhatsApp.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

Bathroom waterproofing before tiling near Al Yarmuk (near Hafar Al-Batin)

If the site is outside Al Yarmuk (near Hafar Al-Batin), the same service is available in Ghirnatah (near Hafar Al-Batin), Qurtubah (near Hafar Al-Batin) and Al Jamiah (near Qaisumah).

Other services in the area

More services in Al Yarmuk (near Hafar Al-Batin)

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Yarmuk (near Hafar Al-Batin):
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp