
Bitumen bathroom waterproofing in Al Yarmuk (near Hafar Al-Batin)
Bitumen bathroom waterproofing in Al Yarmuk starts with photos of the floor and the area around the drain, sent by call or on WhatsApp. The district mixes attached homes with mid-rise buildings, and the bitumen layer belongs before the screed and tiles go in. We serve Al Yarmuk and will tell you from the photos whether the floor alone needs lining or the walls too.
Al Yarmuk is built largely of attached homes and mid-rise buildings, and some bathrooms share a wall with a neighbouring unit. Where that happens, damp can travel through the shared wall and appear at the base of the wall before it shows on the floor. For that reason we do not look at the floor alone, and ask for a photo of the adjoining wall to find the source before any bitumen is applied.
- Al Yarmuk is a residential district in the Eastern Province, lying close to Ghirnatah, Qurtubah and Al Jamiah.
- A wall shared by two neighbouring bathrooms can carry damp across, so both sides are checked together.
The main items of bitumen bathroom waterproofing in Al Yarmuk (near Hafar Al-Batin)
- Cleaning the surface and treating cracks and corners before application
- Checking the concrete floor and wall bases and identifying cracks
- Turning the layer up the walls in the wet zone and sealing the corners
- Applying bitumen layers over the floor including the shower area
The steps of bitumen bathroom waterproofing in Al Yarmuk (near Hafar Al-Batin)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Start from Al Yarmuk (near Hafar Al-Batin) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Al Yarmuk (near Hafar Al-Batin) and around itIncluding Ghirnatah (near Hafar Al-Batin), Qurtubah (near Hafar Al-Batin) and Al Jamiah (near Qaisumah), as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Yarmuk (near Hafar Al-Batin)
Can a bathroom be lined in Al Yarmuk when its wall is shared with a neighbour?
Yes, but the photos of the shared wall are checked first to see whether damp is coming through from the other side. If the source lies outside your bathroom, lining alone will not solve it, and the photos will make that clear.
Does bathroom lining differ for flats and detached homes in Al Yarmuk?
Yes, in flats the floor often sits above another unit or a shared space, which changes the order and limits of the work. Tell us where your bathroom sits in the building, and the photos will show the right method for it.
Do you cover Al Yarmuk (near Hafar Al-Batin)?
Yes. We serve Al Yarmuk (near Hafar Al-Batin) and nearby areas such as Ghirnatah (near Hafar Al-Batin), Qurtubah (near Hafar Al-Batin) and Al Jamiah (near Qaisumah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
Bitumen bathroom waterproofing near Al Yarmuk (near Hafar Al-Batin)
Nearby areas we also cover: Ghirnatah (near Hafar Al-Batin), Qurtubah (near Hafar Al-Batin) and Al Jamiah (near Qaisumah).
More services in Al Yarmuk (near Hafar Al-Batin)




