Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Qurtubah (near Hafar Al-Batin)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Qurtubah (near Hafar Al-Batin)

Bathroom waterproofing before tiling in Qurtubah begins with photos of the floor and walls, sent by call or WhatsApp. The district is largely houses and villas, and the method is set by the damp the photos show.

Qurtubah is made up mostly of houses and villas whose bathrooms differ in age and layout. An older home bathroom was often tiled without a continuous membrane, so damp seeps into the walls beside the shower and basin. Newer bathrooms generally need a connected membrane running up the wet walls before adhesive goes on. The photos show which case yours is.

  • Qurtubah is a residential district in Al-Ahsa, close to Al Wurud, Al Yarmuk and Ghirnatah.
  • Water leaking from a shower reaches the back wall before it shows on the floor, so stains there are the first sign.
What the service includes

What the service covers in Qurtubah (near Hafar Al-Batin)

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

From first contact to the finished job in Qurtubah (near Hafar Al-Batin)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Your request from Qurtubah (near Hafar Al-Batin) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Qurtubah (near Hafar Al-Batin) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Qurtubah (near Hafar Al-Batin)

Does an old home bathroom in Qurtubah need full waterproofing?

Not always. If the damp is confined to the joints, a local repair before waterproofing may be enough. Send the photos and we will tell you whether full waterproofing is needed.

If tiles are already laid, can the bathroom still be waterproofed?

That depends on the condition of the tiles and the floor beneath, which cannot be judged without seeing them. Send photos of the existing tiles and the damp spots, and we will say whether work can proceed over them or they must come up.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Do you cover Qurtubah (near Hafar Al-Batin)?

Yes. We serve Qurtubah (near Hafar Al-Batin) and nearby areas such as Al Wurud (near Hafar Al-Batin), Al Yarmuk (near Hafar Al-Batin) and Ghirnatah (near Hafar Al-Batin), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Qurtubah (near Hafar Al-Batin)

We also offer bathroom waterproofing before tiling in Al Wurud (near Hafar Al-Batin), Al Yarmuk (near Hafar Al-Batin) and Ghirnatah (near Hafar Al-Batin), among the closest areas to Qurtubah (near Hafar Al-Batin).

Other services in the area

More services in Qurtubah (near Hafar Al-Batin)

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Qurtubah (near Hafar Al-Batin):
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp