Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Jamiah (near Qaisumah)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Jamiah (near Qaisumah)

Bathroom waterproofing before tiling in Al Jamiah starts with photos sent by WhatsApp or phone. The area has relatively modern villas and apartment buildings where bathrooms face persistent moisture, especially around shower floors and basins.

Villas and apartments in Al Jamiah are mixed in age, with bathrooms of varying sizes. Modern bathrooms need waterproofing before tiling because daily moisture causes slow seepage into lower layers. Older bathrooms may show wall cracks or water pooling beneath the floor. The waterproof membrane must cover the entire floor and walls to a certain height, extending around pipe entries and corners. Photos show whether existing damage needs treatment before waterproofing.

  • Al Jamiah is a district in Al-Ahsa near Ash Shifa, Al Yarmuk and Ghirnatah, containing varied villas and apartment buildings.
  • Regularly wet bathrooms need tight waterproofing before tiling because water always seeks the weakest point in the structure.
What the service includes

What the service covers in Al Jamiah (near Qaisumah)

  • Forming and treating the floor-to-wall corners before the main layer
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

From first contact to the finished job in Al Jamiah (near Qaisumah)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Al Jamiah (near Qaisumah) and around itIncluding Ash Shifa (near Hafar Al-Batin), Al Yarmuk (near Hafar Al-Batin) and Ghirnatah (near Hafar Al-Batin), as part of our work across the Eastern Province.

Your request from Al Jamiah (near Qaisumah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Al Jamiah (near Qaisumah)

Does bathroom waterproofing before tiling prevent water leaking to the flat below?

Yes, when the waterproof membrane is continuous and sound. Water does not penetrate the concrete and soil beneath, so it does not reach the ceiling and walls of the flat below. But the waterproofing must be applied correctly around all edges and corners.

Can a bathroom in an apartment building be waterproofed without disturbing neighbours?

Yes, the work is confined to the bathroom itself. We remove old tiles and apply the waterproof membrane quietly. We do not need major work in adjoining flats, but we may need some time for drying and treatment.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Do you offer bathroom waterproofing before tiling in Al Jamiah (near Qaisumah)?

Yes. Al Jamiah (near Qaisumah) is within our service area in the Eastern Province, and we also work in Ash Shifa (near Hafar Al-Batin), Al Yarmuk (near Hafar Al-Batin) and Ghirnatah (near Hafar Al-Batin). Call us or send photos of the spot on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Ash Shifa (near Hafar Al-Batin), Al Yarmuk (near Hafar Al-Batin) and Ghirnatah (near Hafar Al-Batin).

Other services in the area

More services in Al Jamiah (near Qaisumah)

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Al Jamiah (near Qaisumah)
and we will plan the next step with you

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp