Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Jishshah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Jishshah

Bathroom waterproofing before tiling in Al Jishshah begins with WhatsApp photos of the bathroom and damp areas. The district mixes older and newer houses, with bathrooms that vary in design, size and condition.

In Al Jishshah, houses of different ages contain bathrooms of various types and sizes, some in corners and some mid-house. Persistent moisture and water leaks around pipes and drains are common in both old and new bathrooms here. A continuous waterproof membrane on the floor and walls before tiling prevents water seeping into brick and concrete. Clear photos of the bathroom from different angles help us choose the right material and proper coverage.

  • Al Jishshah is a district in the Eastern Province, near Al Markaz, Al Jafr and As Sabat, with small houses and villas.
  • A bathroom with moisture problems before tiling may face ongoing water leaks if not properly waterproofed.
What the service includes

What we do for you in Al Jishshah

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

This is how we work in Al Jishshah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Al Jishshah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Jishshah and around itIncluding Al Markaz, Al Jafr and As Sabat, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Al Jishshah

Is pre-tiling waterproofing necessary in every bathroom in Al Jishshah?

Yes, to prevent water and damp seeping into house walls and foundations. Photos show the bathroom condition and whether existing moisture problems need treating before waterproofing.

What if the bathroom is already leaking water before tiling?

The leak source must be identified from photos first. If it is from pipes or drains we address that; if from walls we apply waterproofing after treating the cause.

Do you cover Al Jishshah?

Yes. We serve Al Jishshah and nearby areas such as Al Markaz, Al Jafr and As Sabat, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Jishshah, the same service is available in Al Markaz, Al Jafr and As Sabat.

Other services in the area

More services in Al Jishshah

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Jishshah:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp