Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Markaz

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Markaz

Bathroom waterproofing before tiling in Al Markaz begins with photos sent via WhatsApp or call. Al Markaz is a relatively older district with varied houses and small buildings, where bathrooms may be cramped or damp from years of use, requiring careful wall and floor inspection before work starts.

Al Markaz's buildings are older with small bathrooms on concrete floors that may be cracked or below grade. Water from daily use seeps easily in these buildings, and damp appears on adjacent walls or lower floors. Before new tiling, pipe joints, wall openings and floor penetrations must be checked. Photos help determine whether concrete is damaged or simply needs fresh protection.

  • Al Markaz is an older district in the Eastern Province, near As Sabat, Ar Rumailah and Al Jafr.
  • A bathroom in an older building needs special care because the floor foundation may be below the natural water level in the area.
What the service includes

What the service covers in Al Markaz

  • Forming and treating the floor-to-wall corners before the main layer
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

How we carry out bathroom waterproofing before tiling in Al Markaz

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Al Markaz and around itIncluding As Sabat, Ar Rumailah and Al Jafr, as part of our work across the Eastern Province.

Your request from Al Markaz comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Al Markaz

Does damp I see in my Al Markaz bathroom mean there is a structural defect?

Damp may be from pipe leakage or lack of prior waterproofing, not necessarily a structural defect. Photos clarify the cause, and if real concrete damage exists we will tell you honestly before starting.

Do old bathrooms in Al Markaz need special treatment because of their age?

Yes, an old bathroom may need crack repair first and existing damp removal before the membrane goes on. The approach depends on what photos show about floor and wall condition.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How do I request bathroom waterproofing before tiling in Al Markaz?

Call us, or send clear photos of the spot and its location in Al Markaz on WhatsApp, and we will work out the next step with you.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

We also offer it in neighbouring areas

We also offer bathroom waterproofing before tiling in As Sabat, Ar Rumailah and Al Jafr, among the closest areas to Al Markaz.

Other services in the area

More services in Al Markaz

Worker applying the white insulation layer on a villa roof by the sea

In Al Markaz and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp