Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in As Sabat

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in As Sabat

Bathroom waterproofing before tiling in As Sabat starts with photos sent by call or WhatsApp. The hamlet has scattered houses and villas spread across wide plots, and the bathroom may be newly built or an older space being renewed, its walls and floor needing water protection before tiles are laid.

In As Sabat bathrooms vary in size and construction depending on the house's age and available space. A small bedroom bathroom may have its floor and walls directly on concrete, while a larger one may need slopes for water drainage. Waterproofing before tiling must cover the entire floor and walls around the bath and shower, extending high enough on the walls. Photos show us the concrete's condition and the location of water inlet and drainage so we can choose the right method.

  • As Sabat is a hamlet in the Eastern Province near Al Jafr and Al Markaz, with houses and villas scattered across wide plots.
  • A bathroom has continuous high moisture, so waterproofing before tiling prevents water seeping into the concrete and walls.
What the service includes

The scope of the work in As Sabat

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

The stages of the work in As Sabat

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve As Sabat and around itIncluding Al Jafr, Al Markaz and At Taraf, as part of our work across the Eastern Province.

As Sabat is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in As Sabat

Must the whole bathroom be waterproofed or just the floor?

Walls around the shower and bath face direct water and need waterproofing like the floor. Photos will show us which parts of the bathroom walls need protection before tiling.

How soon after waterproofing can tiles be laid?

That depends on the type of waterproofing, humidity and heat in the bathroom. After seeing the photos and concrete, we will tell you when the waterproofing will be ready for tiles.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What should I send you from As Sabat?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in As Sabat, and we will work out the next step with you.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Jafr, Al Markaz and At Taraf.

Other services in the area

More services in As Sabat

Worker applying the white insulation layer on a villa roof by the sea

In As Sabat and need bathroom waterproofing before tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp