Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Jishshah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Jishshah

Bitumen bathroom waterproofing in Al Jishshah starts with WhatsApp photos of the floor, corners and lower walls. The district has multi-storey houses and single-storey ones, all needing waterproofing before screed and tiling.

Al Jishshah has old and new houses, and many bathrooms suffer dampness and leaks without waterproofing before finishing. Corners and joints between floor and walls need careful attention, as they collect water. Bitumen forms a barrier protecting concrete; the thickness and number of layers vary by surface condition and are shown in the photos before the method is agreed.

  • Al Jishshah is a district in the Eastern Province near Al Markaz, Al Jafr and As Sabat, with varied housing.
  • In bathrooms on upper and lower floors alike, bitumen must cover the floor and lower walls continuously.
What the service includes

What the service covers in Al Jishshah

  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
How we work

The stages of the work in Al Jishshah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Al Jishshah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Jishshah and around itIncluding Al Markaz, Al Jafr and As Sabat, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Jishshah

Can an old bathroom be waterproofed with bitumen in Al Jishshah without removing old tiles?

No, waterproofing must be applied to clean, sound concrete before new tiles. If tiles are present, they must be removed first. Send photos so we can assess the concrete and dampness.

How do we protect bathroom corners from water leaks in Al Jishshah?

Corners and joints need special attention: we apply bitumen carefully in these spots and may use reinforcing strips. Photos show weak corners, and we choose the method accordingly.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Do you cover Al Jishshah?

Yes. We serve Al Jishshah and nearby areas such as Al Markaz, Al Jafr and As Sabat, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Bitumen bathroom waterproofing near Al Jishshah

If the site is outside Al Jishshah, the same service is available in Al Markaz, Al Jafr and As Sabat.

Other services in the area

More services in Al Jishshah

Pool at night with water jets after waterproofing

In Al Jishshah and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp