
Epoxy waterproofing in An Narjis One
Epoxy waterproofing in An Narjis One begins with photos and specs sent by call or WhatsApp. The district has modern multi-storey residential buildings where roofs, tanks and water areas face seepage and damp from heat and humidity.
Modern residential buildings in An Narjis One have roof tanks, wet floors and bathrooms built with contemporary materials, all needing continuous protective layers. Exposed roofs face intense sun that causes periodic expansion and contraction, leading to fine cracks in joints and seams. Tanks and wet areas around bathrooms and kitchens need tough resin that withstands water pressure and heat changes. Surfaces are well prepared, cracks are treated, and epoxy layers are applied; the photos show which areas need more protection.
- An Narjis One is a district in the Eastern Province, close to Az Zawr and Al Jawharah, with modern multi-storey residential buildings.
- Fresh concrete in roofs and wet floors undergoes thermal expansion and contraction, causing fine cracks to appear at joints and seams.
The scope of the work in An Narjis One
- Inspecting the internal surface and locating leak points and cracks
- Cleaning the surface, removing old coatings and roughening it
- Applying epoxy layers with particular care at corners, joints and drain outlets
- Emptying the tank or pool and waiting for the surface to dry fully
The stages of the work in An Narjis One
Send photos of the surface
On WhatsApp: photos inside the tank, the pool or on the floor, showing the cracks, joints and anywhere the leak shows, so we can decide the right treatment.
Dry and prepare the surface
The tank or pool is emptied completely and the surface is left to dry, because epoxy does not bond to damp concrete. The surface is cleaned of dirt and old coatings, then roughened or treated to open the concrete pores.
Treat cracks and joints
Hairline cracks are opened slightly and cleaned, then filled with a suitable material before the resin goes on, because the layer alone does not bridge moving or wide cracks.
Apply the resin layers and let them cure
The two epoxy parts are mixed and successive layers are applied, each left to cure before the next, with particular care at corners, joints and drain outlets.
Why Abraj Al Azl?
A hard surface that resists standing waterOnce cured, the resin is hard and resists standing water and cleaning agents, making it suitable for tanks, basins and wet floors.
Epoxy waterproofing in An Narjis OneWe choose the method and the materials once we know the condition of the spot.
We serve An Narjis One and around itIncluding Az Zawr (near Tarout), Az Zour (near An Narjis One) and Al Jawharah (near Tarout), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in An Narjis One
When should roofs of new buildings in An Narjis One be waterproofed with epoxy?
There is no fixed time, but early protection stops seepage before it damages the interior. If you see hairline cracks or damp on or under the roof, send photos so we can assess when protection is needed.
Does epoxy protect a wet bathroom floor in a new house in An Narjis One?
Yes, epoxy provides a continuous protective layer that stops water seeping to lower layers. The floor is prepared and any cracks treated first, then resin is applied to achieve waterproofing. The photos show the floor's condition and help select the best approach.
Why must the surface be completely dry before epoxy is applied?
Epoxy is a chemical resin that needs to react with the concrete, not with water. Moisture in the concrete prevents full adhesion and can cause the layer to blister or separate later. That is why tanks are emptied and the surface is left to dry before work begins.
How do I know if an old epoxy layer needs renewing?
Signs that renewal is due include blisters or bubbles on the surface, sections that have separated or are lifting, leaks returning through the layer, and unusual discolouration or roughness. If you notice any of these, send photos on WhatsApp and we will assess the condition.
Is epoxy safe for drinking-water tanks?
There are epoxy grades rated for drinking-water contact. When applied in drinking-water tanks, the layer must cure fully before the tank is refilled. Send photos and tell us whether the tank is for drinking or service water, so we can choose the right material.
Do you offer epoxy waterproofing in An Narjis One?
Yes. An Narjis One is within our service area in the Eastern Province, and we also work in Az Zawr (near Tarout), Az Zour (near An Narjis One) and Al Jawharah (near Tarout). Call us or send photos of the spot on WhatsApp.
Areas near An Narjis One
We also work near An Narjis One, in Az Zawr (near Tarout), Az Zour (near An Narjis One) and Al Jawharah (near Tarout).
More services in An Narjis One



