
Epoxy waterproofing in Az Zour (near An Narjis One)
Epoxy waterproofing of bathrooms and pools in Az Zour begins with a photo of the wet area sent via WhatsApp or phone. The district has residential buildings and villas where water surfaces and damp walls need strong, long-lasting waterproofing.
Az Zour mixes residential buildings and family villas, many with pools or large bathrooms. Pools face hot sun and chlorinated water daily, and surrounding walls may crack from water pressure and temperature swings. Bathroom walls and floors retain moisture and may suffer damp and mould. Epoxy lining creates a strong barrier protecting against seepage and wear, and photos help locate weakness and cracks and determine the layer thickness needed.
- Az Zour is a district in the Eastern Province near An Narjis One, Sanabis and Al Jawharah, with residential buildings and villas.
- Pools and bathrooms in villas face strong heating cycles and constant water pressure, so waterproofing must withstand thermal and mechanical stress alike.
The scope of the work in Az Zour (near An Narjis One)
- Inspecting the internal surface and locating leak points and cracks
- Treating hairline cracks and joints before the resin is applied
- Cleaning the surface, removing old coatings and roughening it
- Applying epoxy layers with particular care at corners, joints and drain outlets
The steps of epoxy waterproofing in Az Zour (near An Narjis One)
Send photos of the surface
On WhatsApp: photos inside the tank, the pool or on the floor, showing the cracks, joints and anywhere the leak shows, so we can decide the right treatment.
Dry and prepare the surface
The tank or pool is emptied completely and the surface is left to dry, because epoxy does not bond to damp concrete. The surface is cleaned of dirt and old coatings, then roughened or treated to open the concrete pores.
Treat cracks and joints
Hairline cracks are opened slightly and cleaned, then filled with a suitable material before the resin goes on, because the layer alone does not bridge moving or wide cracks.
Apply the resin layers and let them cure
The two epoxy parts are mixed and successive layers are applied, each left to cure before the next, with particular care at corners, joints and drain outlets.
Why Abraj Al Azl?
Bonded, not floatingEpoxy bonds into the concrete rather than sitting on top, which makes it hard for water pressure from inside to push it off.
Start from Az Zour (near An Narjis One) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Az Zour (near An Narjis One) comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Questions about epoxy waterproofing in Az Zour (near An Narjis One)
Can an old swimming pool in Az Zour be waterproofed with epoxy without draining it?
No, the pool must be completely drained first. Water prevents epoxy from bonding properly to the concrete surface. After draining, cleaning and drying, we determine the layer thickness needed based on the existing structure's condition.
Do old villa bathroom walls in Az Zour need tile removal before epoxy application?
Not necessarily. If the tile is sound and the base is solid, epoxy can be applied straight over it. But if the tile is weak or has deep cracks, it must be removed first. Photos show the tile and wall condition to determine the right first step.
Is epoxy safe for drinking-water tanks?
There are epoxy grades rated for drinking-water contact. When applied in drinking-water tanks, the layer must cure fully before the tank is refilled. Send photos and tell us whether the tank is for drinking or service water, so we can choose the right material.
How do I know if an old epoxy layer needs renewing?
Signs that renewal is due include blisters or bubbles on the surface, sections that have separated or are lifting, leaks returning through the layer, and unusual discolouration or roughness. If you notice any of these, send photos on WhatsApp and we will assess the condition.
Do you offer epoxy waterproofing in Az Zour (near An Narjis One)?
Yes. Az Zour (near An Narjis One) is within our service area in the Eastern Province, and we also work in Az Zawr (near Tarout), An Narjis One and Sanabis (near An Narjis One). Call us or send photos of the spot on WhatsApp.
Is epoxy suitable for waterproofing external roof surfaces?
Epoxy is mainly suited to internal surfaces. Outdoors the layer is exposed to ultraviolet light, which causes yellowing and gradual loss of its properties. On open external surfaces, other materials such as bitumen or liquid membranes are usually more suitable. Photos help us advise which is right for your surface.
We also offer it in neighbouring areas
If the site is outside Az Zour (near An Narjis One), the same service is available in Az Zawr (near Tarout), An Narjis One and Sanabis (near An Narjis One).
More services in Az Zour (near An Narjis One)



