Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in An Narjis One

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in An Narjis One

Epoxy tank lining in An Narjis One starts with WhatsApp messages, photos and calls. The district has villas and apartment buildings with roof tanks, and epoxy protects from slow leakage through concrete.

In An Narjis One most tanks are on roofs where they face direct sun and harsh heat. Exposed concrete expands and shrinks with temperature swings, creating small cracks that grow over time. Additionally, joints between tank sections may leak slowly and unnoticed. Epoxy coating on the inside surface seals the pores, fills cracks and stops seepage. Photos show the tank's condition and crack depth before we choose our approach.

  • An Narjis One is a district in the Eastern Province, near Az Zawr and Al Jawharah, with villas and apartment buildings.
  • Roof tanks in hot areas face daily temperature differences that reach high extremes.
What the service includes

The main items of epoxy tank lining in An Narjis One

  • Rinsing the tank after full cure before it is refilled
  • Preparing the surface and leaving it completely dry
  • Closing the coating around pipe entries and the drain opening
  • Treating hairline cracks and crumbling joints before application
How we work

From first contact to the finished job in An Narjis One

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

Start from An Narjis One with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from An Narjis One comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book epoxy tank lining in An Narjis One

Does epoxy protect a tank roof from heat cracks in An Narjis One?

Epoxy protects against water entering through existing cracks, but cannot stop new cracks from forming due to heat expansion. If cracks are deep or very numerous they may need treatment first, and photos will show that.

How do we know the tank is leaking before coating starts?

Damp around the tank's base or on the roof below it, permanent wet patches, or clear water level drops. We can drain the tank and watch where damp appears around the foundation to pinpoint the leak.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

Is An Narjis One within your service area?

Yes, An Narjis One is one of the areas we work in, as are Az Zawr (near Tarout), Az Zour (near An Narjis One) and Al Jawharah (near Tarout). To start, call us or message us on WhatsApp.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

What is the difference between epoxy and cementitious coating for tank internal waterproofing?

A cementitious coating is mineral-based, tolerates a damp surface and is naturally compatible with concrete, but it is less hard and leaves a rougher finish. Epoxy is harder and smoother and carries internal water pressure better, but it requires a completely dry surface. The choice depends on the tank's condition and how much moisture is in the walls.

Nearby areas

We also offer it in neighbouring areas

We also offer epoxy tank lining in Az Zawr (near Tarout), Az Zour (near An Narjis One) and Al Jawharah (near Tarout), among the closest areas to An Narjis One.

Other services in the area

More services in An Narjis One

Worker rolling the white insulation layer onto a roof

Tell us about your site in An Narjis One
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp