Abraj Al AzlContracting
Call العربية
Worker coating the roof slab beneath a clean roof tank on its stand

Overhead tank waterproofing in Al Aziziyah First District

Your tank is leaking down

Waterproofing for overhead tanks on roofs and towers, covering the stand and pipe entries

+966 54 311 2066
The service in your area

Overhead tank waterproofing in Al Aziziyah First District

Overhead tank waterproofing in Al Aziziyah First District starts with a WhatsApp message containing photos of the tank and where it sits on the roof or tower. The district has homes, villas of varying sizes and residential blocks, where overhead tanks face direct sun all day and often need protection from leaks at the joints and base.

Homes in Al Aziziyah First District range from older villas to newer ones and multi-storey blocks, each with different needs for its overhead tank. An older villa's tank may have been exposed to years of heat and expansion, causing tiny cracks or leaks around the joints. A tank on a metal tower needs protection from rust and moisture around the tower legs and at the tank base. The photos you send show the condition of the concrete and pipes so we can choose the right waterproofing method.

  • Al Aziziyah First District is a district in the Eastern Province near Al Hamra First District and the Government Departments Complex Second District, with homes, villas and residential blocks.
  • An exposed overhead tank on a roof experiences large temperature swings between day and night, stressing both the tank material and its waterproofing.
What the service includes

The overhead tank waterproofing work in Al Aziziyah First District

  • Cleaning the inside and outside surfaces before work begins
  • Treating hairline cracks, open joints and pipe entries
  • Checking the tank body, its cracks, joints and base
  • Leaving the layer to dry and cure before the tank is refilled
How we work

From first contact to the finished job in Al Aziziyah First District

1

Send photos of the tank and the roof

On WhatsApp: photos of the tank body, its base, the pipe entries, the surrounding roof and any damp patches below, so we can read the extent of the leak and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned inside and out, then the body, the base and all pipe entries are inspected for cracks and open joints.

3

Treat cracks and joints

Hairline cracks, open joints, the edges of pipe entries and any nearby AC base are treated before the waterproof layer goes on, depending on the condition of each point.

4

Apply the layer and allow it to cure

The waterproof layer is applied to the tank body from the inside, the outside or both, according to where the leak is, closed firmly around each pipe entry and across the base, then left to dry and cure before the tank is refilled.

What sets us apart

Why Abraj Al Azl?

The tank stops losing water to the roofSealing the tank body and its base stops the slab and the walls being continuously wet, which protects the reinforcement from rust.

Start from Al Aziziyah First District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Aziziyah First District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book overhead tank waterproofing in Al Aziziyah First District

Must the tank be emptied before waterproofing it in Al Aziziyah First District?

Yes, the tank must be completely emptied before waterproofing and repairs begin. The photos you send us will show whether there are active leaks that need treating before the lining goes on.

Do you also waterproof the metal tower itself in Al Aziziyah?

We focus on the tank, joints and base. Rust on the tower legs needs separate treatment, and the photos will show us if rust is affecting the base's integrity or the area around the tank.

What decides the cost of waterproofing an overhead tank?

The size of the tank, the number of pipe entries, the condition of the concrete, how deep the cracks are, whether treatment is needed from one side or both, and how easily the roof can be reached. Send photos and rough dimensions on WhatsApp and we will advise the right treatment.

Why does the damp patch sometimes appear far from the tank?

Water enters at the tank base or around a pipe, then travels inside the slab or between the roof layers until it finds a weaker point and shows there. That is why the patch can be metres away from the tank itself. Photos help us trace the path.

Does the tank concrete suffer from temperature swings?

Yes. A hot climate sees wide temperature swings between summer and winter and between day and night. Repeated expansion and contraction opens hairline cracks in the concrete and weakens joints, especially in tanks that face direct sun. This is one of the most common causes of leaks in overhead tanks.

Do you offer overhead tank waterproofing in Al Aziziyah First District?

Yes. Al Aziziyah First District is within our service area in the Eastern Province, and we also work in Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District. Call us or send photos of the spot on WhatsApp.

Nearby areas

Areas near Al Aziziyah First District

We also work near Al Aziziyah First District, in Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District.

Other services in the area

More services in Al Aziziyah First District

Pool at night with water jets after waterproofing

We start with you in Al Aziziyah First District
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp