Abraj Al AzlContracting
Call العربية
Excavated ground-tank wall being coated with black waterproofing before backfill

Ground tank waterproofing in Al Aziziyah First District

Sealed inside and out

Waterproofing for ground-level and buried tanks, from the inside and the outside

+966 54 311 2066
The service in your area

Ground tank waterproofing in Al Aziziyah First District

Ground tank waterproofing in Al Aziziyah First District starts with a photo of the tank and its location sent via WhatsApp or call. The district has villas and residential buildings of varying ages, where ground tanks face soil moisture and water pressure around them. The waterproofing method depends on the tank's condition and whether it sits below or at ground level.

Ground tanks in the district range from old to new concrete, often surrounded by a yard or open area. Moisture seeps from the soil around them, especially after rare heavy rain, and dampness may show on inner or outer walls. Cracks and joints are common weak points, and external waterproofing protects the tank from underground water pressure. Photos reveal the extent of dampness and cracks before the right waterproofing method is chosen.

  • Al Aziziyah First District is a residential district in the Eastern Province, near Al Hamra First District and the Government Departments Complex Second District.
  • A ground tank bears water pressure from surrounding soil all year, so external waterproofing ensures its integrity over time.
What the service includes

What the service covers in Al Aziziyah First District

  • Cleaning the inner surface of deposits and loose material
  • Rinsing the tank before refilling once the layer has dried and hardened
  • Applying a waterproof layer over the inner walls, floor and joints
  • Checking the walls, floor, joints and pipe entries
How we work

How we carry out ground tank waterproofing in Al Aziziyah First District

1

Send photos of the tank

On WhatsApp: photos of the inner walls, the joints, the pipe entries, the floor and any wet patches outside the tank, so we can read the leak and decide whether the work is inside, outside or both.

2

Empty and clean the tank

The tank is emptied completely, the inner surface is cleaned of deposits and loose material, then the wall, the floor, the joints and the pipe entries are checked for cracks and any open gaps.

3

Treat cracks and joints

Hairline cracks are opened slightly and filled, then the wall-to-floor joints and the pipe entries are treated with care, as these are the most common leak points in ground tanks.

4

Apply the layer and let it cure

The inner waterproof layer is applied over the walls, the floor and the joints, then left to dry and harden. The tank is rinsed before it is refilled. Where external waterproofing is needed, the outer wall is treated before the trench is backfilled.

What sets us apart

Why Abraj Al Azl?

Works against pressure both waysA layer chosen for a ground tank handles water pressure from the inside and soil and groundwater pressure from the outside.

We serve Al Aziziyah First District and around itIncluding Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District, as part of our work across the Eastern Province.

Your request from Al Aziziyah First District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Aziziyah First District

Can a ground tank be waterproofed only from inside in Al Aziziyah?

Internal waterproofing stops leaks but does not protect from external groundwater pressure. Photos show whether external waterproofing is necessary or internal waterproofing alone suffices, depending on soil and moisture conditions.

Does dampness around a ground tank mean the waterproofing has failed?

Not necessarily; dampness may come from minor seepage or natural soil moisture. Photos help identify the source and whether waterproofing needs repair or adjustment.

Do you cover Al Aziziyah First District?

Yes. We serve Al Aziziyah First District and nearby areas such as Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What decides the cost of waterproofing a ground tank?

The area of the inner walls and floor, the number of cracks and joints, whether external waterproofing and excavation are needed, the depth of the tank, and how easily it can be reached. Send photos and rough dimensions on WhatsApp, and tell us if there are damp signs outside the tank as well.

Can the tank be waterproofed while it still has some water in it?

No. The tank must be emptied completely and the inner surface cleaned before any work. Some coatings tolerate damp concrete but all of them need a surface free of standing water and loose deposits. Let us know when the job is agreed and we will guide you through the preparation steps.

Where do ground tanks most often leak?

The joint between the wall and the floor is the most common point, then the pipe entries and service penetrations, then hairline cracks in porous concrete. The joints between rings matter too if the tank is built in sections. Treating these points comes before any coating is applied.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District.

Other services in the area

More services in Al Aziziyah First District

Two workers on the roof insulating around an AC unit

Your first step in Al Aziziyah First District:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp