
Water tank waterproofing in Government Departments
Water tank waterproofing in Government Departments starts with photos of the tank and its roof, sent by call or WhatsApp. We serve this district of office buildings, where tanks are often large and sited on flat roofs, so the photos help plan the lining.
This district is built around office buildings, public facilities and some staff housing, so its tanks range from large roof units to smaller ones serving a single block. Flat roofs gather rainwater at drains and parapets, and the joints where tank and roof meet are the places most worth examining. Bathrooms and kitchens in heavily used buildings can add wear to nearby walls and floors. We look at photos of the tank, the roof and the wet areas to see where the damp really starts.
- Government Departments is a district of the Eastern Province, placed close to Yebrin and Ar Rabie.
- Flat roofs hold water at drains and parapets, so those edges need checking as well as the tank.
The water tank waterproofing work in Government Departments
- Emptying the tank and cleaning the surface of deposits and scale
- Checking the surface once dry before the tank is refilled
- Inspecting the tank inside and outside and locating the leak source
- Treating hairline cracks and deeper cracks separately
How we carry out water tank waterproofing in Government Departments
Send photos of the tank
On WhatsApp: photos of the tank from inside and outside, the damp patches, and the pipes and their entry points, so we can read the leak and decide the right treatment.
Empty and clean the surface
The tank is emptied and the surface is cleaned of deposits and scale. It is then dried or left damp depending on the lining chosen, because adhesion starts with a clean surface.
Treat cracks, joints and pipe entries
Hairline cracks and deeper cracks are treated separately, the joints between the walls and the floor are sealed, and the pipe entries are closed before the main waterproof layer goes on.
Apply the lining and allow it to cure
The waterproof layer is applied to the inside, the outside or both faces depending on the situation, then left to cure fully before the tank is refilled.
Why Abraj Al Azl?
The water loss stopsClosing the pores, cracks and joints stops the tank losing water through the concrete and its weak points.
We serve Government Departments and around itIncluding Yebrin (near Al Ekhaa), Yabrin (near Al Khunn) and Ar Rabie (near Al Khunn), as part of our work across the Eastern Province.
Water tank waterproofing in Government DepartmentsWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Government Departments
Can a large shared tank on a flat roof be treated?
Often yes, but a large shared tank needs its size, access and water supply planned around the work. Send photos of the tank and roof, and we will tell you what the photos show.
Do you also check the bathrooms of office buildings?
Yes, where damp is coming through a wall or floor, we look at the wet areas along with the tank. The photos should show the bathroom wall and the tank together so we can see whether they are linked.
What are the signs of a leak in a concrete tank?
A falling water level with no consumption that explains it, damp patches on the outer walls or the surrounding floor, cracks or white salt deposits on the concrete surface, and sometimes a faint dripping sound. The earlier the treatment the less it costs the structure as a whole.
What should I send you from Government Departments?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Government Departments, and we will work out the next step with you.
What decides the cost of waterproofing a tank?
The tank size, how many faces need treating, the surface type and condition, the depth of the cracks, which lining material suits the situation, and how easily the tank can be reached. Send photos and rough dimensions on WhatsApp and we will set out the right treatment.
Does the house need to be vacated while the tank is waterproofed?
The house does not usually need to be vacated, but the tank must be empty and the water supply to it cut off for the whole time the work is being done and the lining is curing. We tell you how long you will need an alternative water source when the job is agreed.
The same service in nearby areas
Nearby areas we also cover: Yebrin (near Al Ekhaa), Yabrin (near Al Khunn) and Ar Rabie (near Al Khunn).
More services in Government Departments




