
Ground tank waterproofing in Government Departments
Ground tank waterproofing in Government Departments covers buried and ground-level tanks in offices, public buildings and the homes around them. Our starting point is a set of photos sent to us by call or on WhatsApp.
This district combines office and public buildings with housing, so its ground tanks are often larger and more heavily used than a single house tank. Where a tank serves a building with many occupants, the lining must cope with repeated filling and draining as well as the water's weight. Access may run through a service yard or a plant area, so the route should appear in the photos. Inspecting the joints and the tank floor usually decides how the work is planned.
- Government Departments is a district of the Eastern Province, lying close to Yebrin and Ar Rabie.
- Tanks serving several occupants are refilled often, so the lining must cope with repeated filling and draining.
The main items of ground tank waterproofing in Government Departments
- Rinsing the tank before refilling once the layer has dried and hardened
- Treating hairline cracks and the wall-to-floor joint
- Applying a waterproof layer over the inner walls, floor and joints
- Checking the walls, floor, joints and pipe entries
The steps of ground tank waterproofing in Government Departments
Send photos of the tank
On WhatsApp: photos of the inner walls, the joints, the pipe entries, the floor and any wet patches outside the tank, so we can read the leak and decide whether the work is inside, outside or both.
Empty and clean the tank
The tank is emptied completely, the inner surface is cleaned of deposits and loose material, then the wall, the floor, the joints and the pipe entries are checked for cracks and any open gaps.
Treat cracks and joints
Hairline cracks are opened slightly and filled, then the wall-to-floor joints and the pipe entries are treated with care, as these are the most common leak points in ground tanks.
Apply the layer and let it cure
The inner waterproof layer is applied over the walls, the floor and the joints, then left to dry and harden. The tank is rinsed before it is refilled. Where external waterproofing is needed, the outer wall is treated before the trench is backfilled.
Why Abraj Al Azl?
Works against pressure both waysA layer chosen for a ground tank handles water pressure from the inside and soil and groundwater pressure from the outside.
Start from Government Departments with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Government Departments and around itIncluding Yebrin (near Al Ekhaa), Yabrin (near Al Khunn) and Ar Rabie (near Al Khunn), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Before you book ground tank waterproofing in Government Departments
Do larger ground tanks need a different method?
They often need more preparation, because the floor and joints cover more area and must be checked fully. The photos will show the tank's size and condition, and the method is chosen from them.
Can the work avoid disrupting an occupied building?
Planning is part of the work, since the water supply to the building may need to be stopped during the job. Tell us in your message how the building is used, and we will plan the stages around it.
Where do ground tanks most often leak?
The joint between the wall and the floor is the most common point, then the pipe entries and service penetrations, then hairline cracks in porous concrete. The joints between rings matter too if the tank is built in sections. Treating these points comes before any coating is applied.
Can the tank be waterproofed while it still has some water in it?
No. The tank must be emptied completely and the inner surface cleaned before any work. Some coatings tolerate damp concrete but all of them need a surface free of standing water and loose deposits. Let us know when the job is agreed and we will guide you through the preparation steps.
What decides the cost of waterproofing a ground tank?
The area of the inner walls and floor, the number of cracks and joints, whether external waterproofing and excavation are needed, the depth of the tank, and how easily it can be reached. Send photos and rough dimensions on WhatsApp, and tell us if there are damp signs outside the tank as well.
What should I send you from Government Departments?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Government Departments, and we will work out the next step with you.
Areas near Government Departments
We also work near Government Departments, in Yebrin (near Al Ekhaa), Yabrin (near Al Khunn) and Ar Rabie (near Al Khunn).
More services in Government Departments




