Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Az Zahra

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Az Zahra

Epoxy tank lining in Az Zahra starts with photos of the interior and floor, sent by call or WhatsApp. The walls and floor are coated with resin to stop water escaping through porous concrete and through cracks and joints.

Az Zahra is a residential district dominated by family housing, small buildings and villas, with both ground-level tanks and roof tanks. A long-standing concrete tank tends to leak through its pores and joints, so interior coating is a suitable option if the walls are strong. The photos show whether a spot repair is needed first or a full interior coat.

  • Az Zahra is a residential district in the Eastern Province, with Al Jawahir, Al Wurud and An Narjis among the nearest places.
  • In older tanks sediment collects on the floor, so the interior is cleaned before coating so the resin can bond.
What the service includes

The main items of epoxy tank lining in Az Zahra

  • Checking the interior walls, the floor, the joints and the pipe entries
  • Applying primer then epoxy coats across the full interior surface
  • Treating hairline cracks and crumbling joints before application
  • Closing the coating around pipe entries and the drain opening
How we work

How we carry out epoxy tank lining in Az Zahra

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

Start from Az Zahra with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Az Zahra comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on epoxy tank lining in Az Zahra

Does a tank in Az Zahra need cleaning before epoxy coating?

Yes, sediment and residue on the walls and floor are removed so the resin can bond well. The photos help us judge how much cleaning is needed before work starts.

What decides the coating method for a tank in Az Zahra?

It depends on the condition of the concrete, whether the tank is on the roof or the ground, and where the cracks and joints appear in the photos.

Does epoxy suit all tank types?

Epoxy suits concrete tanks that can be emptied and dried. It needs a fully dry surface to bond, so it is not used over wet concrete or across moving cracks. Tanks with large cracks or soil movement need the cracks treated first, or a more flexible material chosen. Send photos of the tank and we will advise.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

What is the difference between epoxy and cementitious coating for tank internal waterproofing?

A cementitious coating is mineral-based, tolerates a damp surface and is naturally compatible with concrete, but it is less hard and leaves a rougher finish. Epoxy is harder and smoother and carries internal water pressure better, but it requires a completely dry surface. The choice depends on the tank's condition and how much moisture is in the walls.

What should I send you from Az Zahra?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Az Zahra, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Jawahir, Al Wurud (near Tarout) and An Narjis.

Other services in the area

More services in Az Zahra

Worker rolling the white insulation layer onto a roof

In Az Zahra and need epoxy tank lining?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp