
Cementitious tank waterproofing in Az Zahra
Tank waterproofing in Az Zahra with a cementitious coating starts with photos sent by call or WhatsApp, showing the tank's inside and its yard. We serve Az Zahra, a district of the Eastern Province near Al Jawahir, Al Wurud and An Narjis, where many homes have a ground tank in the yard.
Az Zahra is largely made of houses with gardens and yards, so the water tank is often a ground-level concrete or block tank beside the house. Ground tanks sit lower and can be wet on the outside, so a leak may show as damp on a wall rather than as water on the floor. The coating goes on the inside, so the tank must be emptied and its surface prepared first, and we ask about access and drainage in the photos before agreeing the method.
- Az Zahra is a district in the Eastern Province, close to Al Jawahir, Al Wurud and An Narjis, where houses with gardens are the usual type.
- A ground tank can show damp on its outer wall before any water appears inside.
What the service covers in Az Zahra
- Emptying the tank, cleaning the surface and removing any crumbling old layer
- Applying the cementitious coating to the walls, the floor and all corners
- Treating cracks and joints before the coating is applied
- Closing the waterproofing around pipe entries and the tank base
The stages of the work in Az Zahra
Send photos of the tank
On WhatsApp: photos of the inside and outside walls, the tank base, the pipe entries and the joints, so we can read its condition and decide the right treatment.
Empty and prepare the surface
The tank is emptied and cleaned, the old or crumbling layer is cut back, then cracks, joints and pipe entries are treated with compatible materials before the coating goes on.
Apply the cementitious coating
The coating is brushed or trowelled onto the walls and floor in layers, with care at corners, joint edges and pipe entries, depending on the surface condition and the depth of the porosity.
Cure with moisture
The coating is left to cure, and a little ambient moisture is kept around it, because the chemical reaction that bonds it to the concrete needs moisture rather than complete dryness.
Why Abraj Al Azl?
It seals the pores, not just covers themThe mineral material works into the concrete structure and fills the pores, making the concrete itself denser and less permeable.
Start from Az Zahra with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Az Zahra comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Az Zahra
My tank is buried in the yard, can you still work on it?
The inside is usually reached through the access cover, so a buried tank can often be coated from within once it is emptied. Send photos of the cover and the ground around it, and we will say whether the opening allows the work.
Do you coat tanks at villas in Az Zahra?
Yes, we serve Az Zahra. Send a photo of the tank's lid, the pipes entering it and the wall around it, and tell us whether the stored water is for the house or a garden irrigation line.
Is the cementitious coating right for both roof tanks and ground tanks?
It works inside both. For a ground tank there may also be a need for external waterproofing if outside pressure from wet soil is high, and that is assessed from photos and the site. For a roof tank the effect of sun and heat on the outside is a separate consideration.
Is Az Zahra within your service area?
Yes, Az Zahra is one of the areas we work in, as are Al Jawahir, Al Wurud (near Tarout) and An Narjis. To start, call us or message us on WhatsApp.
Can the coating be applied without fully emptying the tank?
No. The tank must be emptied, cleaned and its surface prepared before anything is applied. A little moisture inside the concrete structure does not stop the coating bonding, but water standing on the surface will. Emptying the tank is a basic condition for the layer to work.
How long should I wait before refilling the tank after waterproofing?
The coating needs enough time to set and complete its chemical reaction with the concrete before water touches it. How long depends on the thickness of the layers, the surrounding moisture and the temperature. We tell you when the tank is ready based on the conditions at the site once the work is done.
We also offer it in neighbouring areas
We also offer cementitious tank waterproofing in Al Jawahir, Al Wurud (near Tarout) and An Narjis, among the closest areas to Az Zahra.
More services in Az Zahra




