Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Jisr

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Jisr

Epoxy tank lining in Al Jisr applies a resin coating to the inside walls and floor of a water tank, stopping seepage through porous concrete, cracks and joints. The work starts with photos of the tank sent by call or WhatsApp, and we serve the Al Jisr district in the Eastern Province.

Al Jisr is mostly villas and smaller residential buildings, with tanks both at ground level and on roofs. An older concrete tank often leaks through its pores and wall joints, which epoxy lining addresses when the structure is sound. Wide cracks or crumbling concrete must be repaired first, and the photos will show which case applies before a method is chosen.

  • Al Jisr is a residential district in the Eastern Province, close to Ishbiliya, Al Hamra and Al Khuzama.
  • A porous concrete tank can lose water through its walls well before a visible stain appears on the surface.
What the service includes

The scope of the work in Al Jisr

  • Rinsing the tank after full cure before it is refilled
  • Closing the coating around pipe entries and the drain opening
  • Treating hairline cracks and crumbling joints before application
  • Preparing the surface and leaving it completely dry
How we work

The steps of epoxy tank lining in Al Jisr

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

Stops water loss through the concreteThe coating seals the pores and hairline cracks that allow slow water loss without any obvious visible leak.

Your request from Al Jisr comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Jisr and around itIncluding Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Jisr

Is epoxy suitable for villa tanks in Al Jisr?

Often yes, provided the tank is concrete and sound in structure. Suitability is judged from photos of the walls and floor; if wide crumbling shows, we will explain that before work starts.

How do I start a tank lining request in Al Jisr?

Send clear photos of the tank from inside and outside by call or WhatsApp, noting where it is and roughly how large it is. We review the photos and then tell you the next step.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

Does the tank need cleaning before epoxy lining?

Yes, and this step cannot be skipped. Algae, lime deposits and dirt stop the epoxy bonding to the surface, leaving the lining weak and likely to detach early. Tank cleaning is a separate step that comes before the lining, and you can ask about it separately.

Do you offer epoxy tank lining in Al Jisr?

Yes. Al Jisr is within our service area in the Eastern Province, and we also work in Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar). Call us or send photos of the spot on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Jisr, the same service is available in Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar).

Other services in the area

More services in Al Jisr

Worker rolling the white insulation layer onto a roof

We start with you in Al Jisr
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp