Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Hamra (near Al Khobar)

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Hamra (near Al Khobar)

Epoxy tank lining in Al Hamra starts with a photo of the inside of the tank, sent by call or WhatsApp. The district has homes and residential buildings, where the tank is often on the roof, and the photos show whether interior epoxy is the right fix.

Al Hamra consists of homes and residential buildings, and its tanks vary in age and construction. In concrete tanks, water usually escapes through pores and cracks at the base and walls, so the loss builds up gradually. An interior epoxy coat forms a sealed layer that reduces leakage, and the photos show whether the concrete is sound enough before application.

  • Al Hamra is a district of Jeddah in Makkah Province, close to Al Khawr, Al Jisr and Ibn Sina, with homes and residential buildings.
  • Slow leakage from a concrete tank can stay hidden for a while, first showing at the base or joints.
What the service includes

What the service covers in Al Hamra (near Al Khobar)

  • Closing the coating around pipe entries and the drain opening
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Treating hairline cracks and crumbling joints before application
  • Applying primer then epoxy coats across the full interior surface
How we work

This is how we work in Al Hamra (near Al Khobar)

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

A smooth surface slows deposit build-upThe hard smooth finish reduces algae and deposits sticking to the tank walls, making periodic cleaning simpler.

We serve Al Hamra (near Al Khobar) and around itIncluding Al Khawr, Al Jisr and Ibn Sina, as part of our work across the Eastern Province.

Your request from Al Hamra (near Al Khobar) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about epoxy tank lining in Al Hamra (near Al Khobar)

How long does an epoxy coat last in a tank in Al Hamra?

Lifespan depends on the tank's condition, the quality of preparation and how it is used. We make no fixed promises, and expectations are set after reviewing the photos.

Can a building tank in Al Hamra be lined without fully emptying it?

Usually application requires emptying and drying the tank so the epoxy bonds properly. Send photos of the tank so we can agree the right method with you.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

What should I send you from Al Hamra (near Al Khobar)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Hamra (near Al Khobar), and we will work out the next step with you.

What is the difference between epoxy and cementitious coating for tank internal waterproofing?

A cementitious coating is mineral-based, tolerates a damp surface and is naturally compatible with concrete, but it is less hard and leaves a rougher finish. Epoxy is harder and smoother and carries internal water pressure better, but it requires a completely dry surface. The choice depends on the tank's condition and how much moisture is in the walls.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

Nearby areas

Areas near Al Hamra (near Al Khobar)

Nearby areas we also cover: Al Khawr, Al Jisr and Ibn Sina.

Other services in the area

More services in Al Hamra (near Al Khobar)

Worker rolling the white insulation layer onto a roof

Your first step in Al Hamra (near Al Khobar):
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp