Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Sudayr

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Sudayr

Pool waterproofing before tiling in Sudayr starts with photos of the pool and its corners, sent by call or WhatsApp. The area has homes and farm properties whose pools are often concrete shells built before tiling.

Sudayr is an area of wide homes and farm properties, and its pools are generally concrete shells built on site before tiling. Corners and wall-to-floor joints need checking before tile adhesive, as do the inlets and pump positions, where cracks surface later. The photos show the shell's condition and what it needs before lining.

  • Sudayr is an area with wide homes and farms, lying near Alahsaa, Al Fanatir and Makkah.
  • A farm pool faces direct sun and dust, so the surface needs careful preparation before lining.
What the service includes

The scope of the work in Sudayr

  • Cleaning the surface and removing casting residue and dust
  • Inspecting the concrete and locating cracks and hairline cracks
  • Applying the waterproof layer across the floor, walls and pool rim
  • Checking the layer is complete before tiling is allowed to begin
How we work

How we carry out pool waterproofing before tiling in Sudayr

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Your request from Sudayr comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Sudayr and around itIncluding Alahsaa (near Al Fadili), Al Fanatir and Makkah, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Sudayr

Do you waterproof farm pools in Sudayr before tiling?

Yes, we serve Sudayr. Send photos of the pool and its location, and tell us the tiling stage and shell type so we can agree the steps with you.

What is checked in a concrete pool in Sudayr before adhesive?

We check the floor, corners and joints, plus the areas around water inlets and pumps. The photos show which spots need treatment before lining begins.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What should I send you from Sudayr?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Sudayr, and we will work out the next step with you.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Alahsaa (near Al Fadili), Al Fanatir and Makkah.

Other services in the area

More services in Sudayr

Mosaic-tiled seaside pool

We start with you in Sudayr
with one call

Describe the problem and where it is in Sudayr, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp