
Pool waterproofing after tiling in Sudayr
We treat leaking tiled pools in Sudayr, starting by locating the source of the leak before any repair. Send us photos of the pool and the damaged areas by call or WhatsApp so we can assess the case with you.
Sudayr has wide residential plots with villas and homes that often include gardens, and tiled pools there face sharp heat swings in summer. Leaks usually appear at tile joints and around fittings and valves. We treat these points only after the source of the water is identified, since the photos often show whether it comes from the walls, the floor or the fittings.
- Sudayr is a district in the Eastern Province near Al Fanatir and Makkah, where homes often sit on plots with gardens and villas.
- Most leaks in tiled pools start at small joints rather than in the tiles themselves, so diagnosis begins there.
What the service covers in Sudayr
- Watching the water level after filling to confirm the leak is closed
- Closing pump, light and return fittings from inside
- Lifting damaged tiles and rebuilding the layer behind them where needed
- Injecting cracks with a compound suited to the concrete shell
The stages of the work in Sudayr
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.
Sudayr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Pool waterproofing after tiling in SudayrWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing after tiling in Sudayr
How can I tell if the water loss is a leak or just evaporation?
Evaporation lowers the water evenly, whereas a leak usually shows at one spot or as a loss that keeps growing. Send photos of the water level and any damp areas around the pool so we can tell them apart.
Do you treat leaks from fittings and valves in pools?
Yes, we treat leaks from fittings and valves as part of repairing a tiled pool, once the exact point of leakage is identified. Send a photo of the fitting and the damp spot so we can see whether that is the case.
How do I request pool waterproofing after tiling in Sudayr?
Call us, or send clear photos of the spot and its location in Sudayr on WhatsApp, and we will work out the next step with you.
How do I know my pool is leaking and not just evaporating?
Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.
Can the pool be used straight after treatment?
No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
We also offer it in neighbouring areas
If the site is outside Sudayr, the same service is available in Alahsaa (near Al Fadili), Al Fanatir and Makkah.
More services in Sudayr


