Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Munifah District

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Munifah District

Pool waterproofing before tiling in Munifah District begins with photos of the pool basin, its corners and its pipe inlets, sent by call or WhatsApp. Munifah District is a Al Ahsa neighbourhood of private homes and mid-sized dwellings, where the pool is usually in the house yard.

The neighbourhoods of Munifah contain private homes and mid-sized houses, and pools there are often built in the back or side yard. Older basins tend to show cracks at the corners and joints, which bear stress over time, while a newer one often only needs its surface prepared before tiling. Summer heat acts on exposed concrete, so the photos determine the condition of each basin before a method is chosen.

  • Munifah District is a district in Al Ahsa in the Eastern Province, close to As Sunaidah District, Al Marbidia District and Al Bandariyah District.
  • Corners and joints in a concrete basin carry the most stress, so they are treated before the wide surfaces.
What the service includes

The pool waterproofing before tiling work in Munifah District

  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

The stages of the work in Munifah District

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Your request from Munifah District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Munifah District and around itIncluding As Sunaidah District, Al Marbidia District and Al Bandariyah District, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Munifah District

Can a pool in Munifah District be waterproofed without removing the old tiling?

That depends on the condition of the tiles and how well they are bonded to the concrete. The photos will show whether they can stay or must come off before the lining.

What are the main checkpoints for a pool in Munifah District?

We check the corners, the joints, the pipe inlets and any cracks in the walls. Send photos of all these spots on WhatsApp so we can begin the assessment.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Do you cover Munifah District?

Yes. We serve Munifah District and nearby areas such as As Sunaidah District, Al Marbidia District and Al Bandariyah District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: As Sunaidah District, Al Marbidia District and Al Bandariyah District.

Other services in the area

More services in Munifah District

Mosaic-tiled seaside pool

We start with you in Munifah District
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp