Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Munifah District

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Munifah District

Cementitious pool waterproofing in Munifah District starts with photos of the pool and its surroundings, sent by call or WhatsApp. Munifah lies near As Sunaidah, Al Marbidia and Al Bandariyah districts, with a mix of small and medium homes.

Munifah's neighbourhoods are mostly closely spaced homes, and pools there are usually small and walled in by the yard. Older pools may absorb water through the walls and show surface cracking, and a flexible cement coating seals these pores and gives the surface some give. The photos show whether the joints and edges need checking before work starts.

  • Munifah District is a residential district in the Al Ahsa area of the Eastern Province, close to As Sunaidah, Al Marbidia and Al Bandariyah.
  • Small walled-in pools hold moisture in shade, so their surfaces stay damp for longer.
What the service includes

What the service covers in Munifah District

  • Checking the pool walls and floor and locating cracks and openings
  • Applying the flexible cementitious layer over the whole shell
  • Treating hairline cracks and the wall-to-floor junction
  • Cleaning the concrete surface and removing any adhesive residue or dust
How we work

The steps of cementitious pool waterproofing in Munifah District

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Start from Munifah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Munifah District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in Munifah District

Is cementitious coating suitable for a small pool in Munifah?

In many cases yes, since small pools are relatively easy to prepare. The photos show the surface condition and how much the walls absorb water before a method is chosen.

How are pool joints checked in Munifah District?

Joints and edges are checked from the photos you send, which should show any visible cracking or water spread. If the joints need treating we will say so before proposing the coating.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

What should I send you from Munifah District?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Munifah District, and we will work out the next step with you.

Nearby areas

Areas near Munifah District

We also offer cementitious pool waterproofing in As Sunaidah District, Al Marbidia District and Al Bandariyah District, among the closest areas to Munifah District.

Other services in the area

More services in Munifah District

Empty seaside pool during waterproofing

Tell us about your site in Munifah District
and we will plan the next step with you

Call us or send photos of the pool walls and floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp