Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Marbidia District

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Marbidia District

Pool waterproofing before tiling in Al Marbidia District starts with WhatsApp photos of the pool and surrounding concrete. The residential district has villas and small blocks, most pools are new and need thorough treatment before tiling.

Al Marbidia District has villas and small blocks with mostly newly built pools. Fresh concrete after casting shows small defects and joints between panels, fine cracks at corners and pipe entries. Intense heat and dry air in the Eastern Province speed surface cracking, and the pool itself applies constant water pressure to floor and walls. Treating all these points before tiling provides long-term protection, and photos show the detail we need.

  • Al Marbidia District is a district in the Eastern Province, close to Al Mirqab, Al Uwaimiriyah and As Sunaidah districts, with villas and small residential blocks.
  • New pools in residential districts need thorough treatment of joints and corners as these are the weakest points before tiling.
What the service includes

The scope of the work in Al Marbidia District

  • Applying the waterproof layer across the floor, walls and pool rim
  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
How we work

From first contact to the finished job in Al Marbidia District

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

We serve Al Marbidia District and around itIncluding Al Mirqab District, Al Uwaimiriyah District and As Sunaidah District, as part of our work across the Eastern Province.

Start from Al Marbidia District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Al Marbidia District

Are joints between concrete panels dangerous in a pool?

Yes, water seeps through them easily if not carefully treated. Every joint must be filled and protected before tiling so water does not get underneath.

Do we need to inspect the pool before waterproofing starts in Al Marbidia?

Yes, send clear photos from different angles, especially corners, floor and joints. From the photos we identify in detail what must be treated before we start.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Do you offer pool waterproofing before tiling in Al Marbidia District?

Yes. Al Marbidia District is within our service area in the Eastern Province, and we also work in Al Mirqab District, Al Uwaimiriyah District and As Sunaidah District. Call us or send photos of the spot on WhatsApp.

Nearby areas

Areas near Al Marbidia District

Nearby areas we also cover: Al Mirqab District, Al Uwaimiriyah District and As Sunaidah District.

Other services in the area

More services in Al Marbidia District

Mosaic-tiled seaside pool

Tell us about your site in Al Marbidia District
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp