
Pool waterproofing before tiling in Ash Shihiyah
Pool waterproofing before tiling in Ash Shihiyah starts with photos of the shell, cracks and joints sent by call or WhatsApp. The village has compact houses, some with private pools that need full concrete protection before tiling to stop any seepage. Early treatment ensures the pool stays sound.
Ash Shihiyah is a village of compact houses, and pools there are usually small or medium-sized, built beside the house or under a cover. New concrete often shows fine cracks from extreme temperature swings and harsh aridity. Corners and joints between walls and floor are most at risk of seepage, as are electrical and pipe connection points. Treating all these spots before tiling prevents problems from the start. Photos help us assess crack severity and pick the right approach.
- Ash Shihiyah is a village in the Eastern Province, near Al Wahah, Al Majd and Al Wurud, with compact houses and villas.
- Joints between pool walls and floor are among the weakest leak points in small private pools.
What the service covers in Ash Shihiyah
- Applying the waterproof layer across the floor, walls and pool rim
- Treating corners and pour joints with a suitable compound
- Checking the layer is complete before tiling is allowed to begin
- Inspecting the concrete and locating cracks and hairline cracks
The stages of the work in Ash Shihiyah
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.
We serve Ash Shihiyah and around itIncluding Al Wahah (near Ash Shihiyah), Al Majd and Al Wurud (near Ash Shihiyah), as part of our work across the Eastern Province.
Your request from Ash Shihiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Ash Shihiyah
What are signs a pool was not waterproofed before tiling?
Dampness around the tile base or water leaking under the tiles into the yard. If this happens before you lay tiles, send photos; if after, you may need deeper repair.
Do small cracks in new pool concrete need waterproofing before tiles?
Yes, even very small cracks let water through slowly. Photos will show whether the cracks need treatment before tiling.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
What should I send you from Ash Shihiyah?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ash Shihiyah, and we will work out the next step with you.
What decides the cost of waterproofing a pool before tiling?
The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
We also offer it in neighbouring areas
Nearby areas we also cover: Al Wahah (near Ash Shihiyah), Al Majd and Al Wurud (near Ash Shihiyah).
More services in Ash Shihiyah


