Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Wahah (near Ash Shihiyah)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Wahah (near Ash Shihiyah)

Pool waterproofing before tiling in Al Wahah starts with photos of the concrete shell sent by call or WhatsApp. The district has houses and villas of varying sizes, many with private pools that need careful preparation before tiling begins.

Pools in Al Wahah vary widely in shape and age, from newly built to older ones. Exposed concrete is prone to cracking at joints, corners and around pipe entries, and the district's intense summer heat increases this stress. Proper treatment before tiling prevents water seepage later and moisture damage. Photos show the concrete's condition and any existing cracks to choose the best treatment method.

  • Al Wahah is a district in the Eastern Province, close to Ash Shihiyah, Al Majd and Al Wurud, with houses and villas of varying sizes.
  • Joints and corners at the pool floor and walls are the first places where cracks appear under water pressure and heat.
What the service includes

What the service covers in Al Wahah (near Ash Shihiyah)

  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Checking the layer is complete before tiling is allowed to begin
How we work

How we carry out pool waterproofing before tiling in Al Wahah (near Ash Shihiyah)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

We serve Al Wahah (near Ash Shihiyah) and around itIncluding Ash Shihiyah, Al Majd and Al Wurud (near Ash Shihiyah), as part of our work across the Eastern Province.

Your request from Al Wahah (near Ash Shihiyah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Wahah (near Ash Shihiyah)

How long does pool waterproofing before tiling take in Al Wahah?

The duration depends on the pool size and the concrete's condition. The photos you send show us what we are dealing with, and we will tell you what is needed after reviewing them.

Can a pool be waterproofed before tiling if it has many cracks?

Yes, cracks are treated as part of the preparation. The approach depends on the crack depth and location, and photos will show which cases need extra steps.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How do I request pool waterproofing before tiling in Al Wahah (near Ash Shihiyah)?

Call us, or send clear photos of the spot and its location in Al Wahah (near Ash Shihiyah) on WhatsApp, and we will work out the next step with you.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

Areas near Al Wahah (near Ash Shihiyah)

Nearby areas we also cover: Ash Shihiyah, Al Majd and Al Wurud (near Ash Shihiyah).

Other services in the area

More services in Al Wahah (near Ash Shihiyah)

Mosaic-tiled seaside pool

Tell us about your site in Al Wahah (near Ash Shihiyah)
and we will plan the next step with you

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp