Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Wurud (near Ash Shihiyah)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Wurud (near Ash Shihiyah)

We provide pool waterproofing before tiling in the Al Wurud district, starting with photos of the pool, its corners, joints and pipe inlets sent by call or WhatsApp. The district is largely residential, and private pools there are usually built in the yards of houses and villas.

Al Wurud is largely residential, with houses and villas that have yards, so its pools vary with the space available. Older concrete pools may show cracks at the corners and around pipe inlets, which need care before tile is fitted. The photos show each pool's condition before we suggest a waterproofing method.

  • Al Wurud is a residential district in the Eastern Province, lying close to Al Majd and Al Wahah.
  • A pool in an open yard faces dust and temperature swings, so its joints are checked before tiling.
What the service includes

What the service covers in Al Wurud (near Ash Shihiyah)

  • Applying the waterproof layer across the floor, walls and pool rim
  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
How we work

From first contact to the finished job in Al Wurud (near Ash Shihiyah)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Your request from Al Wurud (near Ash Shihiyah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Pool waterproofing before tiling in Al Wurud (near Ash Shihiyah)We choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Al Wurud (near Ash Shihiyah)

Can a pool in a house yard in Al Wurud be waterproofed before retiling?

Usually yes, provided the concrete is sound. Cracks and inlets are treated first and then the waterproofing goes on; if the shell is damaged, the photos will show it.

What information do we need to start waterproofing a pool in Al Wurud?

Clear photos of the pool, its corners, joints and pipe inlets, and an idea of its approximate age. The photos are usually enough to set the initial need.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

How do I request pool waterproofing before tiling in Al Wurud (near Ash Shihiyah)?

Call us, or send clear photos of the spot and its location in Al Wurud (near Ash Shihiyah) on WhatsApp, and we will work out the next step with you.

Nearby areas

Pool waterproofing before tiling near Al Wurud (near Ash Shihiyah)

If the site is outside Al Wurud (near Ash Shihiyah), the same service is available in Al Majd, Al Wahah (near Ash Shihiyah) and Ash Shihiyah.

Other services in the area

More services in Al Wurud (near Ash Shihiyah)

Mosaic-tiled seaside pool

Your first step in Al Wurud (near Ash Shihiyah):
a call or a WhatsApp message

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp