Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Ash Sheraa

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Ash Sheraa

Pool waterproofing before tiling in Ash Sheraa starts with photos of the pool basin and its corners, sent by call or WhatsApp. The district is made up of houses and varied villas, and its pools are usually built in concrete and need treatment before tiles are fixed.

Pools in this district range from newly built basins to ones put in years ago, and the difference often shows in the horizontal joints and wall ends. Before adhesive goes on, the shell should be free of visible cracks and trapped moisture, which the photos reveal clearly. The shape of the corners and the depth of the basin then decide the lining method best suited to your pool.

  • Ash Sheraa is a district of Dammam in the Eastern Province, next to Ar Raja, Al Amwaj and As Sawari, with a mix of houses and villas.
  • A concrete pool carrying tile must stay dry behind it, or the tile will eventually lift away.
What the service includes

The main items of pool waterproofing before tiling in Ash Sheraa

  • Inspecting the concrete and locating cracks and hairline cracks
  • Closing feed and drain pipe inlets and light fitting openings
  • Cleaning the surface and removing casting residue and dust
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

From first contact to the finished job in Ash Sheraa

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Start from Ash Sheraa with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Ash Sheraa is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Ash Sheraa

What do the photos check before a pool in Ash Sheraa is waterproofed?

The photos show visible cracks, horizontal joints, wall ends and pipe inlets. From them we judge whether the shell is ready for lining or needs repair first.

Do you serve new pools in Ash Sheraa?

Yes, we serve Ash Sheraa. Send photos of the pool basin before the tiles go on, and tell us its age and construction material so we can agree the right lining with you.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What should I send you from Ash Sheraa?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ash Sheraa, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ar Raja, Al Amwaj and As Sawari (near Dhahran).

Other services in the area

More services in Ash Sheraa

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Ash Sheraa?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp