Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Ar Raja

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Ar Raja

Pool waterproofing before tiling in Ar Raja starts with photos of the pool and its surroundings, sent by call or WhatsApp. The district mixes houses and scattered residential plots, and the concrete shell is treated before any tile adhesive is applied.

Homes in Ar Raja vary in plot size, and some have wide yards suited to a pool built on site. The exposed shell takes a lot of heat in summer, and small structural joints and hairline cracks can show along the pool edge and at pipe inlets. Whether joint sealing is enough or a full lining is required can only be judged from the photos.

  • Ar Raja is a residential district in the Eastern Province, near Ash Sheraa, Al Kawthar and Al Maha.
  • Joints between sections of a concrete pool shell are where water most often gets beneath the tiles.
What the service includes

The pool waterproofing before tiling work in Ar Raja

  • Applying the waterproof layer across the floor, walls and pool rim
  • Checking the layer is complete before tiling is allowed to begin
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
How we work

The stages of the work in Ar Raja

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Ar Raja is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Pool waterproofing before tiling in Ar RajaWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in Ar Raja

Are pool joints in Ar Raja treated before tiling?

Yes, joints and pipe inlets are treated before tile adhesive goes down. Send clear photos of the joints and edge so we can settle the right treatment.

Must old tiles be removed to waterproof a pool in Ar Raja?

It depends on the old tiles' condition and how firmly they are bonded. Tell us if they are present in the photos and we will advise whether to work over them or remove them first.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

How do I request pool waterproofing before tiling in Ar Raja?

Call us, or send clear photos of the spot and its location in Ar Raja on WhatsApp, and we will work out the next step with you.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Ar Raja, the same service is available in Ash Sheraa, Al Kawthar (near Dhahran) and Al Maha (near Dhahran).

Other services in the area

More services in Ar Raja

Mosaic-tiled seaside pool

Your first step in Ar Raja:
a call or a WhatsApp message

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp