Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Ash Sheraa

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Ash Sheraa

We treat leaks in tiled pools in Ash Sheraa, locating the source first and then sealing the joints, cracks and fittings. Send pool photos by call or WhatsApp and we will confirm the right steps.

Ash Sheraa is a district of detached houses and walled villas, where private pools are usually built in the back yard. Water there often escapes where the wall meets the floor and around surface drains, and the source is frequently inside the concrete shell. We therefore pinpoint the fault before choosing the repair.

  • Ash Sheraa is a residential district in Al-Ahsa in the Eastern Province, close to Ar Raja, Al Amwaj and As Sawari.
  • Where a pool wall meets its floor, stress concentrates, making that corner one of the most common leak points.
What the service includes

The main items of pool waterproofing after tiling in Ash Sheraa

  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Watching the water level after filling to confirm the leak is closed
  • Closing pump, light and return fittings from inside
  • Resealing joints with a flexible water-resistant compound
How we work

This is how we work in Ash Sheraa

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

We serve Ash Sheraa and around itIncluding Ar Raja, Al Amwaj and As Sawari (near Dhahran), as part of our work across the Eastern Province.

Pool waterproofing after tiling in Ash SheraaWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing after tiling in Ash Sheraa

Do you treat leaks in private pools in Ash Sheraa?

Yes, we serve Ash Sheraa. Send photos of the pool and tell us where you see the water dropping, so we can identify the leak with you before any work.

Does repairing a pool in Ash Sheraa require draining it completely?

That depends on where the fault is. Some joints and fittings can be treated after lowering the water level, and we will explain what your case needs once the photos are reviewed.

Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?

In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.

Do you cover Ash Sheraa?

Yes. We serve Ash Sheraa and nearby areas such as Ar Raja, Al Amwaj and As Sawari (near Dhahran), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Nearby areas

Pool waterproofing after tiling near Ash Sheraa

Nearby areas we also cover: Ar Raja, Al Amwaj and As Sawari (near Dhahran).

Other services in the area

More services in Ash Sheraa

Pool at night with water jets after waterproofing

We start with you in Ash Sheraa
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp