Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in An Naqa

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in An Naqa

Pool waterproofing before tiling in An Naqa starts with photos sent by call or WhatsApp. The district has villas with private pools, each needing careful concrete and joint preparation before tiling.

Pools in An Naqa vary in age and condition, from new pools to older ones needing renewal. Fresh concrete is usually sound but may need thorough cleaning, while older concrete may show cracks or wear, especially at joints and corners. Treatment covers surface cleaning, filling fine cracks and preparing areas around pipes and drains. This all ensures good adhesion for waterproofing and tiles. Photos clearly show what needs work.

  • An Naqa is a district in the Eastern Province, near Ad Dirah Two, Al Khisab and An Noor, with residential villas and pools.
  • Concrete wear around pipe and drain openings is common in older pools and needs repair before waterproofing.
What the service includes

The pool waterproofing before tiling work in An Naqa

  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

From first contact to the finished job in An Naqa

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve An Naqa and around itIncluding Ad Dirah Two, Al Khisab and An Noor (near Sayhat), as part of our work across the Eastern Province.

Start from An Naqa with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in An Naqa

How long does pool base preparation take before tiling and waterproofing?

It depends on concrete condition and pool size. Photos you send show the duration exactly, and we will tell you what is needed after reviewing them.

Must a pool be replaced if it has deep cracks?

Not necessarily. If the pool structure is sound, we repair cracks and apply waterproofing. But if damage is very severe, photos will show it and we will advise you on the best option.

Do you cover An Naqa?

Yes. We serve An Naqa and nearby areas such as Ad Dirah Two, Al Khisab and An Noor (near Sayhat), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

The same service in nearby areas

We also offer pool waterproofing before tiling in Ad Dirah Two, Al Khisab and An Noor (near Sayhat), among the closest areas to An Naqa.

Other services in the area

More services in An Naqa

Mosaic-tiled seaside pool

We start with you in An Naqa
with one call

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp