Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in An Naqa

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in An Naqa

Pool waterproofing in An Naqa starts with photos sent by call or WhatsApp. The flexible coating gives concrete lasting protection and keeps tiles bonded and secure.

An Naqa has multi-storey apartment buildings and villas with many shared and private pools. Pools here face sharp temperature swings day and night and season to season, stressing concrete and creating fine cracks at corners and joints. Water also seeps around pipe entries and dampens outer walls. Cementitious coating restores concrete protection and stops seepage.

  • An Naqa is a residential district in Al-Ahsa in the Eastern Province, near Ad Dirah Two, Al Khisab and An Noor.
  • High heat and dry air make exposed concrete prone to shrinkage and fine cracking that may only be visible under water.
What the service includes

What the service covers in An Naqa

  • Treating hairline cracks and the wall-to-floor junction
  • Closing return pipe openings and drain outlets before the coating goes on
  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Wet curing after application so the coating sets correctly
How we work

The stages of the work in An Naqa

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

Cementitious pool waterproofing in An NaqaWe choose the method and the materials once we know the condition of the spot.

Start from An Naqa with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in An Naqa

Does cementitious coating stop water leaking from corners and joints?

Yes, the coating fills fine cracks and gaps at corners and joints, forming a continuous water barrier. But deep cracks or pits will show in photos and need repair before coating.

Is cementitious coating affected by sun heat on a pool?

The coating is designed to withstand heat and water together. Clear photos from several angles let us assess the concrete and tile surface and advise you on what suits your pool.

Does cementitious waterproofing work for both in-ground and above-ground pools?

Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

How does cementitious waterproofing differ from other pool coatings?

Cementitious waterproofing is cement-based with flexible additives; it bonds to concrete and accepts tile adhesive directly on top. Other types such as polyurethane or epoxy have different properties and suit different situations. The choice depends on the concrete condition and whether tiles are going on, which the photos help us work out.

Do you offer cementitious pool waterproofing in An Naqa?

Yes. An Naqa is within our service area in the Eastern Province, and we also work in Ad Dirah Two, Al Khisab and An Noor (near Sayhat). Call us or send photos of the spot on WhatsApp.

Nearby areas

Cementitious pool waterproofing near An Naqa

We also work near An Naqa, in Ad Dirah Two, Al Khisab and An Noor (near Sayhat).

Other services in the area

More services in An Naqa

Empty seaside pool during waterproofing

We start with you in An Naqa
with one call

Call us or send photos of the pool walls and floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp