
Cementitious pool waterproofing in Al Khisab
Cementitious pool waterproofing in Al Khisab begins with a WhatsApp message containing photos of the pool from different angles. The district is residential with villas and apartment buildings, some of which have private pools. The flexible cementitious coating seals cracks, protects the concrete from leaks and the effects of continuous water exposure.
Pools in Al Khisab vary in size, age and design with the homes they are in. A pool in an older home may have porous concrete that leaks water slowly, especially at joints between tiles and walls. The flexible cementitious coating penetrates the concrete, fills small pores and forms a flexible barrier that tolerates movement beneath it. Open pools in the Eastern Province suffer intense heat and dryness, and clear photos help assess the best solution.
- Al Khisab is a district in the Eastern Province near At Tif, Qurtubah and Al Muntazah, with villas and residential apartment buildings.
- Old concrete in a pool loses water content slowly through fine pores, and cementitious coating stops this slow seepage.
What the service covers in Al Khisab
- Checking the pool walls and floor and locating cracks and openings
- Closing return pipe openings and drain outlets before the coating goes on
- Treating hairline cracks and the wall-to-floor junction
- Wet curing after application so the coating sets correctly
This is how we work in Al Khisab
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Your request from Al Khisab comes to usCall or WhatsApp on one number, and we answer you ourselves.
Al Khisab is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on cementitious pool waterproofing in Al Khisab
Does cementitious coating treat concrete cracks in an old pool?
Yes, the coating fills fine and moderate cracks in concrete. Very large cracks may need pre-treatment before coating. Photos clarify the crack sizes and we determine the first step with you.
Can a water-filled pool be coated with cementitious coating?
No, the pool must be empty and dry before coating so the coating adheres properly to the concrete. Tell us the pool's condition when you send photos and we will guide you through the steps.
How do I request cementitious pool waterproofing in Al Khisab?
Call us, or send clear photos of the spot and its location in Al Khisab on WhatsApp, and we will work out the next step with you.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
The same service in nearby areas
If the site is outside Al Khisab, the same service is available in At Tif, Qurtubah (near Inak) and Al Muntazah (near Sayhat).
More services in Al Khisab
