Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Ad Dirah Two

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Ad Dirah Two

Pool waterproofing before tiling in Ad Dirah Two begins with photos of the pool, its corners and joints, sent by call or WhatsApp. The district has homes and residential compounds with pools of varied size and age.

Pools in Ad Dirah Two range from those in private villas to those in shared residential compounds, and their ages and construction differ. Corners, joints and pipe openings need attention before tile adhesive goes on, as they move with the shell more than other areas. The photos show which pools need a full lining and which can be handled with local repair.

  • Ad Dirah Two is a district in the Eastern Province near An Naqa, An Noor and As Salam, with homes and residential compounds that have varied pools.
  • A pool under heavy use needs closer attention at its joints, since it sees more movement and water than others.
What the service includes

What we do for you in Ad Dirah Two

  • Applying the waterproof layer across the floor, walls and pool rim
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

This is how we work in Ad Dirah Two

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from Ad Dirah Two with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Ad Dirah Two comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ad Dirah Two

Does waterproofing a pool in a compound differ from one in a villa in Ad Dirah Two?

Access to the pool and the order of work can differ, but the basic shell treatment stays the same. We determine this from the photos and from the site details you send us.

What should I know before retiling an old pool in Ad Dirah Two?

Check the cracks and joints beneath the old tiles, since what the tiles hide may be the most important factor in the approach. Send photos of the pool before the tiles are removed, if possible.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Do you cover Ad Dirah Two?

Yes. We serve Ad Dirah Two and nearby areas such as An Naqa, An Noor (near Sayhat) and As Salam (near Sayhat), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

We also work near Ad Dirah Two, in An Naqa, An Noor (near Sayhat) and As Salam (near Sayhat).

Other services in the area

More services in Ad Dirah Two

Mosaic-tiled seaside pool

We start with you in Ad Dirah Two
with one call

Describe the problem and where it is in Ad Dirah Two, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp