Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Wasitah District

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Wasitah District

In Al Wasitah District, pool waterproofing before tiling is planned from photos sent by call or WhatsApp, which show the concrete and its corners before tile adhesive goes on. The work begins with the structure and is then completed with the lining.

Al Wasitah District is made up of homes and villas with gardens of varying size, and its pools are generally built at ground level rather than on a roof. Problems usually gather at the wall-to-floor joint and around the drain openings, and the ground around the basin can stay damp in humid seasons. The photos show where the problem actually lies in your pool.

  • Al Wasitah District is a residential district in Hofuf in the Eastern Province, near Ath Thulaythiyah, Ar Rafiah and Al Marbidia.
  • A ground-level basin surrounded by damp soil needs more careful lining at the floor.
What the service includes

The scope of the work in Al Wasitah District

  • Inspecting the concrete and locating cracks and hairline cracks
  • Closing feed and drain pipe inlets and light fitting openings
  • Cleaning the surface and removing casting residue and dust
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

How we carry out pool waterproofing before tiling in Al Wasitah District

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Your request from Al Wasitah District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Wasitah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Al Wasitah District

Does the method differ for a ground-level pool in Al Wasitah?

It can, depending on the damp around the basin and its age and material. We choose the method after seeing the photos and tell you what suits your pool.

Do you treat drain openings in Al Wasitah?

Yes, we check the drain and skimmer openings and treat the area around them before tiling, since they are among the most common leak points in pools.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Do you cover Al Wasitah District?

Yes. We serve Al Wasitah District and nearby areas such as Al Thulaythiyah District, Ar Rafiah District and Al Marbidia District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

If the site is outside Al Wasitah District, the same service is available in Al Thulaythiyah District, Ar Rafiah District and Al Marbidia District.

Other services in the area

More services in Al Wasitah District

Mosaic-tiled seaside pool

Your first step in Al Wasitah District:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp